Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)90 <br />CES CONSULTANTS, INC. <br />As a key member of the Program Management Team, CES staffed a Lean <br />Director and four full-time Construction Managers/Construction Engineering <br />Inspectors who provided support in the following technical areas: <br /> »Provided MEP support to the development of design standards, development <br />of design criteria for scope packages, management of the design schedule, <br />performed plans and design reviews for all design packages, including <br />tracking and resolution of all design comments, oversaw design quality <br />control for engineering disciplines, and submittals approval. <br /> »Site considerations: provided advice relative to the site considerations including existing topography, parking requirements, etc. at <br />all JHS Campuses to compile the necessary information for the proper delivery of the program as well as other MEP support services <br />associated with the Bond program. Assisted in the validation of the Capital Program. <br /> »Developed, managed and maintained the Program’s comprehensive Master Plan schedule. <br /> »Worked with JHS and e-Builder to establish and implement an electronic central documents library. <br /> »Reviewed schedule updates including baseline and baseline updates. <br /> »Reviewed TIA and schedule related documents and established scheduling standards and procedures for the program as well as <br />other scheduling assignments associated to the bond program. <br /> »Provided support and oversight of strategic Planning & Programming and Design services. <br /> »Reviewed the activities and status of the planning model for the facility. <br /> »Oversaw strategic planning, programming and design review meetings. <br /> »Provided input and guidance for the planning and programming assumptions. <br /> »Confirmed that planning and programming assumptions to date are consistent with JHS objectives and principles. <br /> »Reviewed all planning, programming, and design documents, as they were refined for compliance with contractual requirements. <br />Specialized Services Included: <br /> »Programmed the sequence of projects, project scope verification, project design development, development and management <br />of the CIP master schedule, task schedules, and budget/cost oversight of project elements; <br /> »Project management, tracking and reporting of contracts and projects status; daily inspections and logs; and document daily <br />progress and quality of construction work; <br /> »Provided strategic day-to-day oversight and direction for the CIP and specific projects; <br /> »Identified projects and propose mitigation and solutions; <br /> »Assisted in preparation and maintenance of the Program Management Plan; <br /> »Provided cost estimates and schedule of values; <br /> »Assisted with developing contract language and contract negotiations; <br /> »Assisted with plan review function and any Interagency Memorandums of Understanding; <br /> »Coordinated with consultants for cost estimating and review schedule of values of projects; <br /> »Coordinated with other contracted design professionals and consultants and provided support functions not limited to <br />deliverables, review of service orders/invoices, change orders, change order management and commissioning; <br /> »Produced monthly progress reports; <br /> »Worked with client to establish and implement a physical and electronic central documents library and document <br />management system; <br /> »Conducted value engineering; <br /> »Coordinated permits requirements reviews with regulatory agencies and other authorities having jurisdiction; <br /> »Reviewed project verification and design documents, conducted constructability reviews, reviewed construction documents <br />and provided bid phase services, including legal review coordination, bid tabulations and submittals review; <br /> »Oversaw and supported the design and construction phases, prepared modifications and updates to standards and conduct <br />claim analysis; <br /> »Provided construction managers, construction coordinators, construction engineers, commissioning and start-up specialists, <br />inspectors, safety officers and other support personnel for the successful execution of the projects and program; and, <br /> »Processed and recommended approval of progress payments including allowance account and change orders.