Laserfiche WebLink
PAGE 21 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 2 - QUALIFICATIONS <br />| Experience Working with Regulatory Agencies <br />CHA's engineers are experienced in coordinating with multiple <br />government entities and regulatory agencies to support <br />timely project delivery. CHA proactively manages these <br />interfaces by anticipating agency concerns, maintaining clear <br />communication with permitting authorities, and addressing <br />regulatory requirements early in the design process to <br />minimize schedule risk. <br />CHA has successfully navigated the regulatory and permitting <br />landscape at the federal, state, and local levels on projects <br />throughout South Florida and across the country. The firm <br />has a proven track record obtaining permits from agencies <br />including the U.S. Army Corps of Engineers (USACE), the <br />Florida Department of Environmental Protection (FDEP), and <br />the South Florida Water Management District (SFWMD). This <br />experience includes permits required under Section 404 <br />and Section 10 of the Rivers and Harbors Act, Environmental <br />Resource Permits (ERP), and right-of-way permits within <br />SFWMD-controlled areas. <br />The Pineda Causeway Water Transmission Mains project <br />in Brevard County is a strong example of CHA's permitting <br />capability in an environmentally sensitive coastal corridor. The <br />subaqueous crossings beneath the Indian River and Banana <br />River required coordination with multiple regulatory agencies <br />due to the navigable and estuarine character of the waterway <br />environment. The project earned the ACEC Florida Engineering <br />Excellence Honor Award and reflects the level of permitting <br />complexity that CHA manages on a routine basis in South <br />Florida and beyond. <br />Similarly, CHA's design of seven miles of 54-inch and 48- <br />inch redundant sewer force main through downtown Fort <br />Lauderdale using horizontal directional drilling, requiring over <br />60 permits with over 19 agencies, earned the ACEC Florida <br />Grand Award, the highest honor awarded by ACEC Florida, <br />reflecting the technical depth and regulatory coordination <br />required on complex urban infrastructure projects. <br />CHA has extensive experience navigating the regulatory and <br />permitting landscape at the federal, state, and local levels, <br />having successfully obtained permits from a wide range <br />of agencies including the U.S. Army Corps of Engineers, <br />Florida Department of Environmental Protection (FDEP), <br />South Florida Water Management District (SFWMD), as <br />well as various county-level agencies such as Monroe, Miami- <br />Dade, and Broward Counties. We have worked on projects <br />ranging from straightforward roadway resurfacing, restoration, <br />and rehabilitation (RRR) efforts requiring minimal permitting, <br />to highly complex infrastructure developments involving <br />bridges and water crossings. For example, we have managed <br />projects requiring 408 reviews, as well as Section 10 and <br />Section 404 permits from the Army Corps of Engineers <br />for work in navigable waters and wetlands. Additionally, <br />we have secured Environmental Resource Permits (ERP) from <br />both FDEP and SFWMD, and obtained right-of-way permits <br />necessary for construction within SFWMD-controlled areas. <br />Our comprehensive knowledge of regulatory procedures and <br />established working relationships with these agencies have <br />enabled us to streamline the permitting process and meet <br />project deadlines efficiently, while ensuring full compliance <br />with environmental and engineering standards. <br />Permitting can easily become one of the critical paths on any <br />project. Federal and State level permits can take months and <br />cause substantial delays if a proactive plan and process is not <br />executed early in the design phase. CHA not only has vast <br />experience with the type of environmental permitting <br />that may be required on this project, including permitting <br />with FDEP and USACE, but more importantly has years <br />of personal relationships formed with the reviewers at <br />these agencies which will help to expedite review and <br />prevent the project from coming to a standstill while in <br />the permitting phase. <br />Our general approach involves coordinating with the city to <br />achieve concurrence on submitting a 90% set for their review <br />while simultaneously using this set as a permit set for the <br />various regulatory agencies. Permit applications, affidavits, <br />and any other documents required as part of the permit <br />package are also expedited to the city. This speeds up the <br />permitting process and helps to provide some float on the <br />project schedule. Any comments provided by the permitting <br />agencies will be implemented in the 100% submittal, ensuring <br />that all project comments and concerns are addressed before <br />plans are provided to the contractor. The projects listed under <br />our the past performance section, exemplify our successful <br />experience with local, state, and federal regulatory and <br />permitting agencies. <br />DESIGN TEAMS <br />PERMITTING/ <br />COMPLIANCE <br />MANAGER <br />REGULATORY <br />AGENCIES <br />DEVELOP PERMITTING SCHEDULE <br />REQUEST PAYMENTS <br />COMPLY WITH PERMIT REQUIREMENTS <br />MAINTAIN MASTER PERMIT SCHEDULE <br />PREPARE/SUBMIT APPLICATIONS <br />MANAGE PAYMENTS <br />ADVISE REQUIREMENTS <br />REVIEW/RECEIVE APPLICATIONS <br />ADVISE REQUIREMENTS <br />RELEASE PERMITS