Laserfiche WebLink
PAGE 26 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 2 - QUALIFICATIONS <br />11TH STREET ROADWAY RECONSTRUCTION – DESIGN-BUILD SERVICES | CITY OF <br />MIAMI BEACH <br />The 11th Street Roadway Reconstruction was a design-build project completed between 2016 and <br />2017 to address chronic flooding and sea level rise impacts in the City of Miami Beach. The project <br />elevated the roadway by approximately two feet and introduced a new drainage system to improve <br />flood protection for adjacent properties. CHA prepared comprehensive construction documents for <br />roadway reconstruction, utility upgrades, decorative lighting, signalization improvements, landscaping, <br />and pavement markings. The work included installation of a 54-inch force main, 30-inch sanitary gravity sewer, upgraded pump <br />station, and transition to mast arm signalized intersections. During construction, CHA provided construction management <br />services, including shop drawing review, RFI coordination, schedule monitoring, traffic management oversight, and utility <br />coordination, ensuring successful delivery of this critical resilience project. <br />CIVIL ENGINEERING <br />SR 817/UNIVERSITY DRIVE (RIVIERA BOULEVARD TO SR 824/PEMBROKE ROAD) | <br />FDOT DISTRICT 4 <br />As part of a continuing services contract, CHA guided a range of enhancements for the Broward <br />County Metropolitan Planning Organization (MPO) mobility project on SR 817/University Drive. These <br />enhancements were designed to boost pedestrian, bicycle, and traffic safety, as well as to improve <br />transit operations along the route. Key improvements included adding bicycle lanes, achieved by <br />milling, resurfacing, and widening the existing road. The project also involved installing new drainage <br />systems, curbs, and gutters, alongside widening the sidewalks and installing ADA-compliant curb ramps. CHA also oversaw the <br />addition of new bus shelters at existing bus stops and the construction of a pedestrian overpass bridge near the intersection at <br />Miramar Boulevard, which spans the South Broward Drainage District Canal 1. <br />Additionally, the project upgraded signage and pavement markings, and installed pedestrian countdown signals at all signalized <br />intersections. It also entailed replacing light poles that were affected by the road widening and improving overall lighting along <br />the sidewalks. This included retrofitting pedestrian lights at signalized intersections. CHA’s responsibilities extended to <br />coordinating extensively with the MPO, the City of Miramar, various stakeholders, and projects in adjacent areas. <br />GOLDEN GLADES MULTIMODAL TRANSPORTATION FACILITY | FDOT DISTRICT 6 <br />The Golden Glades Multimodal Transportation Facility (GGMTF), a $60 million design-build project <br />completed in February 2022, upgraded the former Park & Ride Center into a modern transportation <br />hub. CHA led the design, delivering a six-story parking garage with 2,150 spaces, a 4,500 sq. ft. <br />transit hub, 10,450 sq. ft. of retail space, and a pedestrian bridge connecting directly to Tri-Rail. <br />The facility also features multi-bay bus terminals, bicycle parking and lockers, improved sidewalks, <br />and reconstructed roadways near SR-9, SR-7, and the Connector Road. Seven advanced technology <br />systems were integrated, including ticket vending, transit information, CCTV surveillance, emergency call boxes, parking <br />management, security access, and Wi-Fi, enhancing safety and efficiency. Strategically located to link Miami-Dade and Broward <br />transit, Tri-Rail, and ridesharing, the GGMTF improves connectivity, reduces congestion, and supports regional mobility. <br />Recognized as Florida’s Best in Construction (2022), it stands as a model for innovative, multimodal infrastructure. <br />Reference: FDOT - District 4; Leslie Wetherell, PE; T: (954) 777-4438; <br />E: leslie.wetherell@dot.state.fl.us | Design Cost: $1.5 M | Year Completed: 2024 <br />Reference: FDOT - District 6; Jackie Sequeira, PE; T: (305) 499-2370; <br />E: jacqueline.sequeira@dot.state.fl.us | Year Completed: 2022 <br />Reference: City of Miami Beach – Igor Vassiliev, Project Manager; T: (305) 546-5891; <br />E: igorvassiliev@miamibeachfl.go | Year Completed: 2017