My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHA Consulting, Inc Bid Document (8)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CHA Consulting, Inc
>
CHA Consulting, Inc Bid Document (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:42:37 PM
Creation date
8/31/2026 12:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 38 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br />| Current and Projected Workload <br />Our proposed key personnel are available to undertake this assignment successfully. Current and projected workloads are <br />analyzed weekly at CHA to allocate resources appropriately. As projects are initiated, the appropriate technical and support <br />resources necessary to perform each task are allocated to meet or exceed all project requirements. The current utilization <br />of the staff is generally in the range of 50-55%, leaving an uncommitted staff effort of between 45% and 50% based on <br />today’s workload. <br />Having provided engineering services to municipal governments for over 72 years, <br />CHA recognizes the pressures municipal officials confront, including budgets and <br />project schedules. We will work collaboratively with the city as a true partner <br />to have sufficient staff, equipment, and systems available to meet or exceed <br />your expectations with our deliverables. With a bench strength of over 2,100 <br />professionals, we do not foresee any issues meeting deadlines. <br />108 <br />Civil <br />135 36 <br />Environmental <br />79 <br />Structural <br />133 <br />Transportation <br />27 <br />Architecture <br />66 <br />Mechanical <br />165 <br />Water/Wastewater Electrical <br />In-House Key Technical Resources
The URL can be used to link to this page
Your browser does not support the video tag.