Laserfiche WebLink
PAGE 75 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br /> ADNAN ISMAIL, PE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> POSITION <br />Senior Geotechnical <br />Engineer AVAILABILITY <br />70% <br /> EDUCATION <br />B.S., Civil Engineering, <br />Florida International <br />University, 2006 <br /> <br />M.S., Civil Engineering, <br />Florida International <br />University, 2013 <br /> REGISTRATIONS <br />Prof. Engineer; FL & TX <br />(FL PE # 76014; 2013) <br />(TX PE # 143698; 2022) <br /> PROFESSIONAL AFFILIATIONS <br />American Society of Civil <br />Engineers & Florida <br />Engineering Society <br /> SUMMARY OF CAPABILITIES <br />Shallow and Deep <br />Foundation Design <br /> <br />Geotechnical <br />Instrumentation <br /> <br />In-Situ Testing <br /> <br />Soil Surveys & Bridge <br />Geotechnical Studies <br /> <br />Pavement Design <br /> <br />Wave Equation Analysis <br /> <br />Slope Stability Evaluations <br /> <br />Foundation Inspections <br />PROFESSIONAL EXPERIENCE - Mr. Ismail has over 20 years of experience and has worked on numerous medium <br />to large geotechnical engineering projects for the public sector, both, domestically and overseas. His expertise <br />includes subsurface explorations, laboratory studies, geotechnical design, analyses and recommendations related to <br />the design and construction of foundation elements of transportation projects, including many pedestrian and vehicular <br />bridges for FDOT D6 projects. <br />Ludlam Trail Corridor PD&E Study, Miami-Dade County PROS. Senior <br />Geotechnical Engineer for 5.6-mile-long, along abandoned FEC corridor for conversion <br />into a linear new shared-use trail park for biking, hiking, trail running and to enhance <br />connectivity/accessibility between schools, parks, transit stops, residences, workplaces, <br />and shopping. Client: Miami-Dade County PROS (c/o AECOM). Year: 2018. <br />New FIU Pedestrian Bridge over SW 8th Street, Miami, FL, FDOT District 6. Senior <br />Geotechnical Engineer assisting with execution of field exploration and laboratory <br />testing, interpreting test results, performing foundation analyses and geotech reports. <br />Client: FDOT (c/o BCC Eng.; FDOT PM: Mr. Humberto Gomez, PE) Year: 2021-2023. <br />SR 836 and NW 87th Avenue Interchange, City of Doral, MDX Project No. 83629. <br />Senior Geotechnical Engineer assisting with field exploration, laboratory testing, <br />geotechnical analyses for roadway, 7 bridges, preparation of geotechnical reports and <br />foundation RFI’s during construction. Client: MDX (c/o: APCTE) Year: 2013-2020. <br />Agency: MDX, Contact: Gil Portela, PE (305.551.8100). <br />SR 90/Tamiami Trail, Design-Build, 2.6-Mile Bridging, Miami, FL. FDOT District 6. <br />Senior Geotechnical Engineer for design & construction responsible for field <br />exploration, laboratory testing, foundation analyses, design, & geotechnical reports, <br />100% PDA testing of 650 piles, foundation certifications, & vibration monitoring. Client: <br />FDOT (c/o: Stantec & Condotte America.) Year: 2016-2019. <br />Hard Rock Stadium/FDOT District 6 Pedestrian Bridges Design-Build. FDOT District 6. Project included the design and construction of 2 pedestrian bridges. Senior <br />Geotechnical Engineer responsible for field explorations, lab testing, foundation <br />analysis, design, inspections, and foundation certifications. Client: Bentley Engineers <br />& Architects, Inc. & Condotte America. Year: 2016-2018. <br />Pedestrian Bridge over SR 826 at Bird Road, Miami, FL. Senior Geotechnical <br />Engineer for design & construction responsible for field exploration & laboratory testing <br />programs, foundation analyses, design, & geotechnical reports, which included 100% <br />PDA testing foundation certifications, & vibration monitoring, MSE walls & roadways. <br />Client: FDOT (c/o: TY Lin & Condotte America.) Year: 2012. <br />Golden Glades Multimodal Center Pedestrian Bridge Connecting to Parking <br />Garage, Miami, FL, FDOT District 6. Senior Geotechnical Engineer responsible for <br />field explorations, lab testing, foundation analysis, design, inspections, & foundation <br />certifications. Client: FDOT (c/o APCTE & LEAD). Year: 2018-2020. FDOT D6 <br />Contact: Raul Quintela, PE (305-470-5105; raul.quintelal@dot.state.fl.us) <br />Pedestrian Bridge over SR-5/US 1, Miami, FL, FDOT District 6. Senior Geotechnical <br />Engineer responsible for planning and executing the field exploration and laboratory <br />testing programs, interpreting the test results, performing foundation analyses for the <br />construction of a new pedestrian bridge. Client: FDOTD6. Year: 2014. FDOT D6 <br />Contact: Ali Toghiani, PE (305-470-5313; ali.toghiani@dot.state.fl.us) <br />SW 1st Street Bascule Bridge over the Miami river. FDOT District 6. Senior <br />Geotechnical Engineer responsible for field exploration, laboratory testing, geotechnical <br />analyses for bascule bridge and roadways, preparation of geotechnical reports & <br />foundation RFI’s. Client: FDOT (c/o: Hardesty Hanover) Year: 2014-2020. FDOT D6 <br />Contact: Humberto Gomez, PE (305-640-7390; Humberto.Gomez@dot.state.fl.us) <br />NW 25th St. W. Viaduct over SR 826, NW 82nd Ave. to SR 826, City of Doral, FDOT District 6, Miami, FL. Senior Geotechnical Engineer for design & construction <br />responsible for field exploration, laboratory testing, foundation analyses, design, & <br />reports, 100% PDA testing of piles, foundation certifications. Client: FDOT. Year: 2015. <br />FDOT D6 Contact: Jason Chang, PE (305-470-5331; Jason.chang@dot.state.fl.us) <br />