PAGE 86 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 4 - APPROACH AND METHODOLOGY <br />PRIORITIZING ACCESSIBILITY AND AVAILABILITY: CHA’s Doral office, located less than an hour from the City of Sunny <br />Isles Beach, enables our team to be readily available for both scheduled and impromptu meetings with city personnel and <br />stakeholders. Our team will utilize digital tools and platforms for effective communication, including shared calendars for <br />scheduling, video conferencing for virtual meetings, and instant messaging for quick coordination. We will maintain open lines <br />of communication for constant accessibility for the city representatives and the community. Our approach includes regular <br />reporting to the city's project manager and preparing comprehensive meeting minutes to verify all stakeholders are well- <br />informed. <br />CHA prides itself on providing strong project management on all its projects and is experienced in ensuring high-quality work <br />within budget and on time. Arnelio, our dedicated contract manager, will ensure the consistent availability of resources <br />and serve as a single point of contact for the city, streamlining communication and decision-making. The following is a <br />description of our approach to schedule control, cost control, and quality control: <br />CONTROL OF PROJECT BUDGET: Maintaining the established budget is a critical aspect of project management, <br />encompassing both design and construction phases. Our comprehensive strategy for budget control starts at the very <br />beginning, with a focus on verifying the most efficient use of resources and minimizing unnecessary expenditures. <br />In the design phase, budget control begins at the scoping and negotiation stage by creating a detailed scope of work and <br />identifying potential optional services early on. A kickoff meeting with the design team sets the stage to review scope elements, <br />identify future design challenges, and develop alternative designs. Early design acceptance is prioritized to prevent the need for <br />costly redesigns and to keep the project within budget. Vigilance against “scope creep” is practiced to confirm all work remains <br />within the agreed scope of services. Assigning the right staff for each assignment ensures the efficient use of resources, while <br />making use of available data, such as traffic counts and existing conditions information, helps to minimize data collection costs. <br />For construction budgeting, we establish a baseline by reviewing and updating the engineer’s estimates to confirm the <br />construction budget. Special attention is paid to items with significantly rising costs, such as steel and asphalt. Collaboration <br />with contractors and the utilization of tools like the FDOT Historical Cost spreadsheet are key strategies for tracking unit costs <br />accurately, leading to more precise estimates. Additionally, contingencies are included for unforeseen and risky items during the <br />design phase, aiming for the bid price to meet or be slightly below the projected cost. Identifying fatal flaws early in the process <br />of evaluating alternative improvements and performing thorough field reviews to document existing conditions are also crucial <br />steps. These measures help avoid unnecessary use of contract resources and construction cost increases due to missing design <br />scope items. <br />This comprehensive approach to cost control, from the initial stages of design through to the completion of construction, allows <br />us to effectively manage and control budgets throughout the entire project lifecycle. <br />Local Office: <br />8935 NW 35th Lane, Suite 200 <br />Doral, FL 33172 <br />Less than an hour from the City <br />of Sunny Isles Beach, enabling <br />rapid response and on-site <br />support