My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHA Consulting, Inc Bid Document (8)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CHA Consulting, Inc
>
CHA Consulting, Inc Bid Document (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:42:37 PM
Creation date
8/31/2026 12:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 87 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 4 - APPROACH AND METHODOLOGY <br />CONTROL OF PROJECT SCHEDULE: Our approach to ensuring the timely delivery of assignments integrates strategic resource <br />allocation with meticulous schedule management, embodying the following principles: <br />• Rapid Resource Assignment: We prioritize the quick deployment of resources to address high-priority tasks based on the <br />city's needs, ensuring critical project components are initiated promptly. <br />• Work Plan Development: By developing a detailed work plan and identifying critical path tasks early on, we can allocate <br />additional resources as necessary to mitigate potential delays. <br />• Expertise-Based Staff Assignment: Assigning staff according to their expertise and experience ensures that tasks are <br />completed correctly the first time, eliminating the need for rework. <br />• Continuous Monitoring: Regular tracking of staff resources and holding weekly internal meetings allows us to stay informed <br />of project progress and address any issues as they arise. <br />Control of Project Schedule from the Project’s Inception: We will establish a schedule that accounts for the time needed <br />for surveying and design, treating the project timeline as a dynamic entity that adapts to the evolving nature of the work. Our <br />proactive management strategy includes: <br />• Dynamic Schedule Adaptation: Recognizing that project timelines are fluid, our schedule is a “living document,” regularly <br />updated to reflect the current project status and to incorporate modifications necessitated by the design process. <br />• Proactive Issue Resolution: By maintaining vigilance over the schedule and addressing issues promptly, we ensure the <br />timely completion of design activities, even in the face of unforeseen challenges. <br />• Schedule Recovery Planning: Should unexpected conditions threaten to derail the project timeline, the CHA team is <br />prepared with a project-specific recovery plan that outlines strategies for realignment with the original schedule, potentially <br />involving extended work hours, activity compression, or the mobilization of additional resources. <br />COMPREHENSIVE DESIGN PROCESS: We are fully equipped to make necessary adjustments to meet the city's need for an <br />accelerated schedule if necessary. Our extensive experience with expedited projects assures our ability to fulfill the city's <br />expectations for efficient project completion. Our methodical approach to the design of construction documents includes: <br />KICKOFF MEETING: We initiate the project with a meeting to discuss the scope and conduct a field <br />visit, followed by a refined task list, an estimated man-hour breakdown, fee proposal, and a project <br />timeline. <br />1 <br />DATA ACCUMULATION: Essential design data such as-built plans, shop drawings, and utility <br />information are collected to inform the design process.2 <br />INITIAL ENGINEERING PHASE: Coordination with key stakeholders and the development of <br />preliminary plans set the foundation for successful project execution.3 <br />FINAL PLANS PRODUCTION PHASE: This phase solidifies the project’s details, including utility <br />relocation schedules and specifications.4 <br />COMPLETION: Upon finalization, we’ll present the city's project manager with signed and sealed <br />construction documents, including plans and specifications.5
The URL can be used to link to this page
Your browser does not support the video tag.