Laserfiche WebLink
25Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />SANTIAGO RIVERA <br />Project Manager <br /> <br />recertification documentation. He also assisted with the post -repair reinspection and contributed to the <br />updated 50-year Structural recertification reports. <br /> <br />West Transfer Station Building #1- Fuel Tank Slab and Painting of Building Cost Estimate. <br />Mr. Rivera was responsible for overseeing the structural design of the West Transfer Station Building No. 1 <br />project, which included the design of the fuel tank slab and coordination of the associated building <br />improvements and cost estimate. <br /> <br />Sailboat Cay Condominium - Parking Garage Shoring Plans (Miami, FL) <br />Mr. Rivera managed the preparation of shoring plans and calculations for the ramp to the third floor of the <br />parking garage, as well as the second, mezzanine, and third floors. Coordinated engineering efforts to <br />ensure the temporary support systems met safety requirements, structural integrity standards, and <br />applicable codes while aligning with overall project objectives. <br /> <br />Bent Tree Elementary School (Miami, FL) <br />Mr. Rivera prepared structural construction plans and calculations for multiple elements across the <br />Elementary School. He oversaw the design of covered walkways connecting Buildings 4, 1, and 10 to the <br />main sidewalk at the drop-off area, as well as concrete repair drawings for walkways and slab covers. <br />Coordinated the structural design for the replacement of exterior doors at Buildings 2, 3, and 13. Provided <br />bid and award support during contractor selection and directed construction administration activities, <br />including the review of shop drawings and submittals and conducting site visits to ensure compliance with <br />design intent and project specifications. <br /> <br />HCA Florida JFK Hospital (Atlantis, FL) <br />Mr. Rivera conducted visual inspection of the exterior façade of the front section of the building to support a <br />structural assessment report. Documented existing conditions, prepared findings and engineering <br />recommendations, and incorporated photographic documentation of observed deficiencies. <br /> <br />Broward Health Medical Center (Broward, FL) <br />Mr. Rivera served as the Project Manager for the project Structural Rehabilitation. He was responsible for <br />overseeing project planning, coordinating multidisciplinary engineering activities, managing communications <br />with the Owner, monitoring project schedule and deliverables, and ensuring compliance with Broward Health <br />requirements. Mr. Rivera supervised the execution of structural assessment, repair design, and construction- <br />phase services, facilitating coordination among the design team, contractors, and stakeholders to support <br />the successful rehabilitation of deteriorated crawl space structural components while maintaining <br />uninterrupted hospital operations. <br /> <br />Fire Station No. 5 Hardening (West Palm Beach, FL) <br />Mr. Rivera is managing the structural engineering services for the evaluation, design, bidding, and <br />construction of resiliency improvements at Fire Station No. 5. Overseeing the structural assessment of the <br />existing roof, windows, and exterior doors, directing the preparation of the Basis of Design Report (BODR), <br />and coordinating the development of signed and sealed structural drawings, calculations, specifications for <br />the recommended hardening measures. Coordinating with City staff, supporting the bidding process, and <br />overseeing construction-phase engineering services through project completion. <br /> <br />Fire Station No. 6 Hardening (West Palm Beach, FL) <br />Mr. Rivera is managing the structural engineering services for the design, bidding, and construction of facility <br />hardening improvements at Fire Station No. 6. Overseeing the development of signed and sealed structural <br />drawings, calculations, and specifications for the replacement of the roof membrane, windows, and exterior <br />doors. Coordinating with City staff and the design team, supporting the bidding process, and overseeing <br />construction-phase engineering services through project completion.