|
27Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />• MS Civil Engineering, 1966
<br />University of Maryland, College
<br />Park, Maryland
<br />• BS Civil Engineering 1962
<br />Universidad Nacional de
<br />Colombia, Bogotá Colombia
<br />S.A.
<br />
<br />PROFESSIONAL REGISTRATION
<br />• Professional Engineer (P.E.
<br />Florida License No. 17382)
<br />• Professional Engineer (P.E.
<br />Colombia License No. 5286)
<br />
<br />PROFESSIONAL AFFILIATIONS
<br />• Florida Engineering Society,
<br />(FES) Miami Chapter.
<br />• National Society of Civil
<br />Engineers
<br />• American Society of Civil
<br />Engineers
<br />• Water Pollution Control
<br />Federation
<br />• American Water works
<br />Association
<br />• The Marine Council
<br />Interamerican Businessman
<br />Association
<br />
<br />FIELD OF SPECIALIZATION
<br />• Civil Engineering Design
<br />• Construction Management
<br />
<br />YEARS OF EXPERIENCE
<br />50+ Years
<br />
<br />
<br />
<br />EXPERIENCE SUMMARY
<br />
<br />Mr. Van Meek is a Senior Civil Engineer at Conemco Consultants,
<br />where he oversees the planning and development of designs within the
<br />Civil Engineering Department for both public and private sector
<br />projects. With decades of experience, his expertise spans r oadways,
<br />water transmission and distribution, as well as sanitary sewer collection,
<br />treatment, and disposal. In addition, Mr. Van Meek plays a key role in
<br />project management, design, construction supervision, and conducting
<br />feasibility assessments.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />Miami-Dade Water and Sewer Department (WASD)
<br />Infiltration/Exfiltration/Inflow (I/E/l) Reduction Program
<br />Engineering and construction management to reduce more than 60
<br />mgd of I/E/I within 5 years at an estimated cost to the county, of $100
<br />M. Work includes work scheduling, permitting process, construction
<br />management, coordination with utility companies as well as federal,
<br />state and local regulatory agencies.
<br />
<br />FEMA Drainage Project - Miami-Dade County (Miami, FL)
<br />As Senior Engineer, Mr. Van Meek led the design of a new storm
<br />drainage system design, to alleviate the spread flooding experienced
<br />during the most recent (Irene and No-Name) storms that affected the
<br />County. Work includes water management analysis of the existing
<br />conditions, new design, coordination with other consultants including
<br />surveyors, utility coordination and construction coordination, and cost
<br />estimates.
<br />
<br />Camp Matecumbe Playground (Miami, FL)
<br />As the Senior Engineer, Mr. Van Meek provided construction
<br />management services and oversaw the preparation of complete civil
<br />drawings and calculations. His responsibilities included paving and
<br />drainage plans, parking lot profiles, traffic coordination, traffic signage
<br />and markings for the parking area and entry drive to support the
<br />property's permitting process.
<br />
<br />AAFERN New Office Building (Miami, FL)
<br />Mr. Van Meek assisted the Senior Engineer in the preparation of a
<br />complete set of structural and civil plans for the construction of a 24,000
<br />sq. ft. office building and metal warehouse used for the maintenance
<br />and repair of large trucks. He also participated in the design of a
<br />concrete slab parking lot, including paving and drainage designs and
<br />traffic signage.
<br />
<br />Miami International Airport (MIA) Perimeter Road Expansion
<br />(Miami, FL)
<br />This project consisted of reconstructing Perimeter Road along the south
<br />portion of the airfield, realigning Perimeter Road along the east side of
<br />the Fuel Farm to NW 20th Street, interfacing with the proposed
<br />Perimeter Road Bridge and Central Boulevard Master Plan and
<br />providing a new connection from the existing North Service Road north
<br />to the Northeast Base and Building 5A.
<br />
<br />GUIDO VAN MEEK, PE
<br />Lead Civil Engineer
<br />
<br />
<br />Compartment ‘C’ Build Out G-508 Station, South Florida Water Management District (SFWM)
<br />(Hendry County, FL)
<br />Mr. Var Meek, as the Senior Engineer, supervised South Florida Water Management District, Storm
<br />Water Treatment Area (STA) on Compartment C land to assist the existing STA’s in improving the
<br />quality of water entering the Everglades Protection Area. This pr oject enables the district to achieve
<br />Everglades water quality standards as part of the implementation of the long-term plan to ensure that
<br />all water discharging into the Everglades protection area complies with State water quality standards.
<br />Involved in the process from quantity take-off, pricing, bidding, and final submittal. Responsible for:
<br />scheduling, monitoring, and supervising the material testing of the project.
<br />
<br />Hidden Lake Office Park, Miami-Dade County (Boca Raton, FL)
<br />Mr. Van Meek, as the Senior Engineer, supervised the preparation of a complete set of civil design
<br />drawings for re-grading, repaving, and implementing a new drainage system as part of the
<br />reconstruction and expansion of the existing bus drop-off loop area. Additionally, as Project Manager
<br />under this contract, he provided consulting civil engineering services for access roadway
<br />improvements, a water transmission and distribution system, and a sanitary sewer collection and
<br />disposal system to serve a 16.5-acre commercial property. This development included seven office
<br />buildings, a 140-seat restaurant, and a 120-room hotel located at S.W. 127 Avenue and S.W. 128
<br />Street in Miami-Dade County, Florida. Mr. Van Meek was directly responsible for preliminary
<br />engineering and design services, negotiations with regulatory agencies, the permitting process, and
<br />construction administration.
<br />
<br />Hadley Park Community Center (Miami, FL)
<br />Civil engineering services include Paving, grading and drainage design, water main extension and
<br />sanitary sewer collection system to serve the center, coordination with the City of Miami Parks and
<br />Recreation Dept. and on their behalf with the State and loc al regulatory agencies, utility coordination,
<br />permitting process, and construction supervision.
<br />
<br />Miami-Dade Parks and Recreation Department (Miami-Dade, FL)
<br />As Senior Engineer, Mr. Van Meek supervised feasibility studies, engineering design, and the
<br />implementation of sanitary sewer connections for 16 parks to public sewers. The project was carried
<br />out in compliance with a Consent Decree between the Miami-Dade County Department of
<br />Environmental Resources Management (DERM) and the Miami -Dade Parks and Recreation
<br />Department (MDPR).
<br />
<br />Blanche Ely High School Bus Loop Renovation (Pompano Beach, FL)
<br />Mr. Van Meek as the Senior Engineer supervised the preparation of a complete set of civil design
<br />drawings for re-grading, repaving, and implementing a new drainage system as part of the
<br />reconstruction and expansion of the existing bus drop-off loop area. His work will include the
<br />supervision of the design of a new aluminum walkway and two additional walkways for the expanded
<br />bus drop-off loop.
<br />
<br />West Gables Rehabilitation Hospital (Miami, FL)
<br />Mr. Van Meek supervised structural and electrical recertification services for a four-story,
<br />approximately 91,135 sq. ft. healthcare facility. His work included field condition assessments,
<br />engineering evaluations, and preparation of recertification reports in compliance with Miami-Dade
<br />County requirements. He also oversaw the documentation of existing systems, identification of
<br />structural and electrical deficiencies, development of repair recommendations supported by
<br />engineering analysis, preparation of repair drawings, and follow-up field verification to confirm
<br />corrective actions and ensure compliance with applicable building codes and life-safety standards.
|