Laserfiche WebLink
Tab 2 - Qualifications <br />Proposed Schedule of Surveying & Mapping Services <br />Phase Typical Duration Anticipated Services <br />Assignment Definition <br />and Data Plan 1–5 business days <br />Confirm the issue, study area, objectives, performance <br />measures, methodology, data requirements, agency coordination, deliverables, and schedule. <br />Background Review <br />and Data Collection 1–3 weeks <br />Review plans, prior studies, traffic and crash data, signal <br />information, development activity, parking and curbside <br />conditions, transit data, and available counts; perform field <br />observations and new data collection. <br />Analysis and <br />Evaluation 2–6 weeks <br />Conduct operational, safety, forecasting, warrant, parking, <br />transit, multimodal, curbside, traffic-calming, or other required <br />analyses. <br />Alternatives and Recommendations 4–8 weeks <br />Develop and compare improvements; evaluate safety, <br />operations, accessibility, right-of-way, drainage, utilities, cost, <br />public input, and implementation constraints. <br />Plans, Specifications, <br />and Estimates <br />8–20 weeks when <br />design is required <br />Prepare concept, preliminary, and final plans, specifications, <br />quantities, estimates, signalization, ITS, lighting, signing and <br />pavement markings, and MOT documents. <br />Implementation and <br />Monitoring <br />Assignment- <br />dependent <br />Support grants, agency approvals, presentations, bidding, <br />construction, timing implementation, pilot programs, and post- <br />implementation performance evaluation. <br />Scheduling may be influenced by seasonal and school-related traffic, availability of reliable crash and <br />operational data, special events, public engagement, and coordination with Miami-Dade County, FDOT, <br />transit providers, and regional planning agencies. CTS will identify long-lead data needs and external <br />coordination requirements at the outset so fieldwork, analysis, agency review, and concept development <br />can proceed concurrently where practical. <br />CTS Value Proposition <br />Integrated expertise. Responsive delivery. Implementable solutions. <br />One Integrated Team: Civil, survey, and transportation expertise coordinated under one <br />accountable team. <br />Built for Continuing Services: Rapid scoping, flexible staffing, and reliable delivery of concurrent <br />assignments. <br />Focused on Sunny Isles Beach: Solutions responsive to constrained corridors, development, mobility, <br />accessibility, and resilience needs. <br />From Analysis to Implementation: Practical recommendations developed with permitting, <br />constructability, cost, and long-term operations in mind. <br />CTS gives the City a responsive multidisciplinary partner focused on turning priorities <br />into projects.