|
Tab 2 - Qualifications
<br />services include SERPM data collection and model-validation support; STOPS coordination,
<br />calibration, and analysis; transit onboard survey development and processing for the SMART
<br />Program; and support for the Transportation Improvement Program, Unified Planning Work
<br />Program, and long-range transportation planning. This experience provides CTS with direct
<br />familiarity with Miami-Dade County’s transportation datasets, regional modeling practices,
<br />planning priorities, agency coordination processes, and multimodal initiatives affecting Sunny
<br />Isles Beach.
<br />• Districtwide Safety Pushbutton Projects, FDOT District 6: CTS has advanced recommendations
<br />from traffic operations studies, public requests, and fatal-crash reviews into accelerated design
<br />assignments. Improvements have included pedestrian and multimodal facilities, ADA upgrades,
<br />signalization, lighting, intersection modifications, drainage, signing and pavement markings,
<br />fixed-object protection, and utility coordination. These assignments require close coordination
<br />with FDOT Design, Traffic Operations and Construction, Miami-Dade County Traffic and
<br />Signals, Miami-Dade Transit, and utility owners, with individual projects commonly advanced on
<br />compressed schedules.
<br />• General Engineering Services, Miami-Dade County DTPW: CTS has provided Project Manager
<br />and Engineer-of-Record services for intersection improvements involving mast arms, pedestrian
<br />countdown signals, ADA push buttons and curb ramps, drainage inlet modifications, milling and
<br />resurfacing, pavement overbuild, utility coordination, signing, and pavement markings. CTS has
<br />also designed speed-feedback signs, pedestrian enhancements, and school-zone improvements
<br />requiring Miami-Dade County review and permitting.
<br />Collectively, this experience demonstrates CTS’s ability to support the City with focused traffic studies,
<br />transit planning, corridor and subarea evaluations, multimodal and Complete Streets initiatives, signal
<br />timing, safety analysis, intersection control, parking and curbside studies, transportation data programs,
<br />agency coordination, conceptual improvements, and final design. Just as importantly, CTS understands
<br />how regional transportation systems affect local streets and can coordinate effectively with Miami-Dade
<br />County, DTPW, the TPO, FDOT District 6, transit operators, municipalities, and community stakeholders.
<br />PortMiami Tunnel Freight Mobility Evaluation Study
<br />Project Manager: Yongqiang Wu, PE
|