Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br /> A SAFEbuilt Company <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 23 <br />City of Miami Beach (Ongoing) <br />1700 Convention Center Drive <br />Miami Beach, Florida 33139 <br />Contact Information: <br />Ariel Guitian <br />Senior Capital Project Coordinator <br />Tel No.: 305.673.6071 x 6732 <br />Email: ArielGuitian@miamibeachfl.gov <br />CGA has provided continuing professional services to <br />the City of Miami Beach since 2004. Services include: <br />• Civil Engineering <br />• Environmental <br />• Planning General <br />• Construction Engineering Inspections (CEI) <br />• Surveying <br />• Landscape Architecture <br />• GIS Services <br />• Traffic Engineering <br />Contract Amount: <br />Multiple Contracts - specific contract information <br />available upon further request from the City. <br />Projects Completed for the City Includes: <br />• Miami Beach North Shore Neighborhood <br />• Block Beach Walk Construction <br />• Electrical Power Distribution Design <br />• Flagler Monument Solar Lighting <br />• Miami Beach South Pointe Park – Pylon Lighting <br />• Middle Beach Recreational Corridor Phase II <br />• Middle Beach Recreational Corridor Phase III <br />• All-Wheels Park Design Studies <br />• North Shore Open Space Park <br />• Police Department Emergency System Bidding <br />and Construction Electrical ASA <br />• Flagler Memorial Monument lighting ASA Update <br />Electrical & Structural Plans <br />• Beach Walk II Phase II – CEI <br />• Middle Beach Phase III – Cultural Resources <br />Assessment Survey <br />• Police Department Roof Structural Analysis <br />• Resiliency Code Consultant Services <br />• Atlantic Way Width Redesign Modifications <br />• NBOP Arborist Reports <br />• Middle Beach Recreational Corridor Phase III – <br />Arborist Reports <br />• Police Department Electrical Assessment and <br />Upgrades <br />• Police Department Mechanical Plans for <br />Generator Upgrades <br />• Lummus Park/Indian Beach Park Survey – <br />Middle Beach Recreational Corridor Phase III <br />• Bay Drive Neighborhood Greenway <br />• Urban Forestry Master Plan <br />Middle Beach Recreational Corridor Phase 2 <br />Police Station Electrical Assessment and Upgrades <br />Middle Beach Recreational Corridor Phase 3