My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br /> A SAFEbuilt Company <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 22 <br />Bath and Tennis <br />WWTP Drying Bed Replacement <br />Sunflower Townhomes Water Main Improvement <br /> WRF Disinfection and Compliance Upgrades <br />City of Boca Raton (Ongoing) <br />1401 Glades Road <br />Boca Raton, FL 33431 <br />Contact Information <br />Talia Garcia, PE <br />Utility Services Engineering Manager <br />Tel No.: 561.338.7307 <br />Email: tgarcia@bocaraton-fl.gov <br />CGA has provided continuing professional services to the City of <br />Boca Raton since 2012. Services include: <br />• Landscape Architecture <br />• Environmental Engineering <br />• Civil Engineering <br />• Transportation Consulting <br />• Surveying Services <br />• Construction Project Management <br />Contract Amount: <br />Multiple Contracts - specific contract information available upon <br />further request from the City. <br />Projects completed for the City include: <br />• Boca Bath and Tennis <br />• Boca Utilities Guard House <br />• Boca Sunflower Townhomes - Water Main Improvements <br />• WWTP Drying Bed Replacement <br />• Boca Sewer MH Replacements <br />• Boca WWTP SFWMD Master Permit MOD Work Order No. <br />19 <br />• Boca Palmetto Park Rd - SUE Services <br />• Boca WRF Disinfection and Compliance Upgrades <br />• Intersection of Palmetto Park Road and NE / SE 5th Avenue <br />• Boca Eastern WM Upgrades <br />• Boca El Rio Canal Aerial Utilities Crossing <br />• Boca NW 2nd Ave Raw WM Relocation <br />• Boca Generators 1-2-3 Assessments <br />• Boca Concentrate PS Rehab Assessment
The URL can be used to link to this page
Your browser does not support the video tag.