Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br /> A SAFEbuilt Company <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 21 <br />Nova Drive <br />Davie Road Phase II LAP <br />Generator Replacement WTP <br />Davie Master Lift Station # 8 and Force Main <br />Town of Davie Professional Services (Ongoing) <br />6591 Orange Drive <br />Davie, Florida 33314 <br />Contact Information <br />Jonathan Vogt <br />Town Engineer <br />Tel No.: 954.797.1137 <br />Email: Jonathan_Vogt@davie-fl.gov <br />Contract Amount: <br />Multiple Contracts - specific contract information available upon <br />further request from the Town. <br />CGA has provided continuing professional services to the Town <br />of Davie since 1996. Services span multiple departments and <br />include: <br />• Roadway, Traffic and Transportation Engineering <br />• Land Development, Civil-Site and Drainage Systems. <br />• Landscape Architect <br />• Water and Wastewater <br />• Utility Engineer <br />• Surveying and Utility Locates <br />• Construction Inspection <br />• Traffic Engineer DRC Reviews <br />Projects completed for the Town include: <br />• Master Lift Station #8 <br />• Davie Road Improvements Phase I, II, and III <br />• Davie Road Phase I Bike Lanes (CIGP) <br />• Davie Road Phase II Complete Streets <br />• Davie Road Phase III Streetscape (MAP Broward) <br />• College Avenue Improvements Phase I and II <br />• Nova Drive Complete Streets <br />• Bamford Park Artificial Turf Conversion <br />• System III 30" Overhead Pipe Replacement <br />• Lift Station #9 Rehabilitation <br />• Lift Station #18 Rehabilitation <br />• Generator Replacement - WTP/WWTP - System II/III <br />• WTP Improvement <br />• SW 30th Watermain Replacement <br />• Bamford Park Reclaimed Water Improvement <br />• SW 82nd Ave Sidewalk