My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 37 <br />Client <br />City of Hallandale Beach <br />400 South Federal Highway <br />Hallandale Beach, FL 33009 <br />Contact Information at Time of Project: <br />Joselaine Pateau <br />Engineer I Public Works <br />Tel: 954.457.1607 <br />jpateau@hallandalebeachfl.gov <br />Project Date <br />2021 – Ongoing <br />Services Provided <br />Civil Engineering <br />Survey <br />Construction Administration <br />Geotechnical (Subconsultant) <br />SUE (Subconsultant) <br />Firm’s Fees <br />$ 42,945.00 <br />Construction Cost <br />$ 293,000.00 <br />CGA was retained by the City of Hallandale Beach to design, permit, and provide construction <br />administration services for a federally funded grants project that includes stormwater and <br />ADA improvements within a residential neighborhood. Areas within the project limits <br />experience significant ponding after a rain event due to lack of storage and positive discharge. <br />Additionally, there are several ADA non-compliant sidewalks. <br />The scope includes approximately 140 linear feet of exfiltration trench, catch basins, roadway <br />reconstruction, sidewalk replacement, swale re-grading, and driveway reconstruction. CGA <br />is currently under contract to provide construction administrative services that include <br />reviewing shop drawings, responding to RFIs, part-time inspections, reviewing as-builts, <br />and final permit closeouts. <br />CDBG 47 (NW 10TH ST DRAINAGE AND ADA <br />IMPROVEMENTS) <br />Hallandale Beach, FL <br />After ImprovementsBefore Improvements
The URL can be used to link to this page
Your browser does not support the video tag.