My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 47 <br />Client <br />City of Miami Beach, FL <br />1700 Convention Center Drive <br />Miami Beach, FL 33139 <br />Contact Information at Time of Project: <br />Carolina Zamora, Project Manager <br />1700 Convention Center Drive <br />Miami Beach, FL 33139 <br />786.575.1584 <br />carolina.zamora@miamibeachfl.gov <br />Project Date <br />2024 - Ongoing <br />Services Provided <br />CEI <br />Firm’s Fees <br />$ 574,193.00 <br />Construction Cost <br />$ 18,132,386.00 <br />Project # 15624-03 <br />This project takes place on Venetian Causeway, which crosses over Biscayne Bay and <br />connects the City of Miami Beach with the City of Miami. The scope includes Horizontal <br />Directional Drilling of HDPE 36” Water Main. 5300 LF and HDD HDPE 12” Force Main. <br />2,600 LF. The scope also includes Tie Ins, Fittings and Road Restoration to connect San <br />Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami <br />Beach. <br />The project consists of setting multiple detours to excavate the road for an entry pit and <br />an exit pit at the receiving end. The contractor installed a wire system to guide the pipe <br />underground around bridge piles, utilities, and dealt with various soil conditions. The new <br />pipe was to become the main line for the water and sewer. The lines connected to the <br />existing main line, with the existing services, and provided redundancy within each island. <br />Miami Beach, FL <br />VENETIAN CAUSEWAY
The URL can be used to link to this page
Your browser does not support the video tag.