My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 48 <br />Client <br />City of Miami Beach, FL <br />1700 Convention Center Drive <br />Miami Beach, FL 33139 <br />Contact Information at Time of Project: <br />Carolina Zamora, Project Manager <br />1700 Convention Center Drive <br />Miami Beach, FL 33139 <br />786.575.1584 <br />carolina.zamora@miamibeachfl.gov <br />Project Date <br />March - November 2023 <br />Services Provided <br />CEI <br />Firm’s Fees <br />$ 105,075.06 <br />Construction Cost <br />$ 239,534.75 <br />Project # 20-125-06 <br />Shoreline Foundation - Continuing Services Contract <br />The work consisted of installing a new seawall over an existing wall with plumb and batter <br />precast concrete piles and pre-cast structural wall panels at Jefferson Avenue on the <br />Collins Canal in Miami Beach. The environment is extremely aggressive, so all reinforcing <br />steel was hot dipped galvanized. <br />The scope included rubble rip rap, a cast-in-place concrete wall cap with backfill and <br />concrete filled gaps. It also included demolition, repairs, and modification to existing <br />adjacent seawall, and manatee grates. Plus, vibration testing and set verifications, tree <br />and mangrove removal, repair or replacement of existing utilities or irrigation, lighting <br />adjustment, drainage, sidewalk, curb, and resurfacing. Contractor cast the walls on site. <br />There was limited workspace available. Contractor worked from land and barge. Crossing <br />utilities made the installation complicated and plans were revised to adjust the paneling <br />for them. Contractor used commercial divers to verify installation of walls around utilities <br />and remove any issues with jetting of piles. <br />Miami Beach, FL <br />JEFFERSON SEAWALL <br />During Construction <br />After Construction
The URL can be used to link to this page
Your browser does not support the video tag.