Laserfiche WebLink
E <br />MS, Civil Engineering: Structural <br />Florida International University <br />BS, Civil Engineering <br />University of Florida <br />L C <br />L C <br />Florida Professional Engineer (PE) <br />#59446 <br />FDOT CTQP <br />TIN # 21840 <br />Earthwork Construction Inspection Level 1 <br />Earthwork Construction Inspection Level 2 <br />Final Estimates Level 1 <br />Final Estimates Level 2 <br />QC Manager <br />FDOT TTC/MOT <br />Advanced #659778 <br />FEMA <br />IS-100IS-100, IS-200, IS-700, IS-800 TS-G1 EOC, TS-G275 Operations <br />Other <br />IMSA Traffi c Signal Level 1 <br />FDOT Emergency Response <br />W H <br /> Construction Engineering and Inspections Lead <br />Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company <br />2018 – Present <br />P E <br /> Senior Project Engineer/Project Administrator <br />Venetian Causeway HDD, Phase 2 <br />City of Miami Beach, FL <br />Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and <br />HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins, <br />Fittings and Road Restoration to connect San Marco to San Marino, San <br />Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. ` <br /> Senior Project Engineer/Project Administrator <br />Sunset Isles HDD, Phase 2 <br />City of Miami Beach, FL <br />Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and <br />HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins, <br />Fittings and Road Restoration to connect San Marco to San Marino, San <br />Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. ` <br /> Senior Project Engineer <br />I-75 Alligator Alley Environmental Education <br />Project 43794-2-62-01, D4 <br />Broward County, FL <br />I-75 Alligator Alley Rest Area at mile marker 30. Scope includes <br />reconfi guration of parking lots, realignment of access road, drainage <br />structures, utilities, lighting, construction of a four story timber <br />observation tower, bridge boardwalks, picnic facilities, and exhibit <br />wetland area. <br /> Senior Project Engineer/Project Administrator <br />Broward County Engineering and <br />Signalization <br />Broward County, FL <br />Broward County Intersection re-construction of Foster Road, Tyler Road, <br />and Fiber Optic Projects along Atlantic Blvd, Wiles Road Ph1,2, and <br />Coconut Creek. <br /> Senior Project Engineer/Project Administrator <br />Indian Trace Roadway Improvement, West 192 <br />City of Weston, FL <br />Project improvements included widening of roadway, turn lanes <br />and extension of bicycle path, signalization cabinet foundation <br />replacement, reconstruction of brick crosswalks with asphalt base, <br />milling and resurfacing, pavement markings, including green bike <br />lanes, and the installation of signing. In addition, the project included <br />modifying existing drainage, and new curb and gutter construction, <br />with new curb inlets. The sidewalks throughout the project were <br />adjusted to accommodate ADA at the approaches and ramps. The <br />project was 13,813 LF, or approximately 2.5 Miles long. <br /> Senior Project Engineer <br />23I-95 Safety Improvements 443847-1-52-01,D4, T4632 <br />Port St. Lucie, FL <br />I-95 from Gatlin Blvd to Saint Lucie West. Scope included overbuild <br />corrections on the super-elevated curves, widening of the ramps, a <br />new safety curve system that lights curve directional signs when speed <br />is exceed or rain/weather triggers the system. Also included drainage, <br />lighting, bridge widening for lighting over SFWMD canal, ITS, DMS <br />Truss, and milling and resurfacing. <br /> Senior Project Engineer <br />CEMEX; Schofi eld Road Improvements Lake County Permit <br />Orange County, FL <br />5.8 miles from US 27 to the Orange County. Line complete road <br />reconstruction and re-alignment with a super elevated curve. <br />Urban and Rural Construction, included excavation, embankment, <br />stabilization and lime rock base, structural asphalt and friction, along <br />with new curb inlets, drainage, ponds, outfalls, and swales. Earthwork <br />was 25’ cuts and 25’ fi lls. A 96” Concrete Pipe was installed for CEMEX <br />material conveyor system. <br />, <br />E P, PE <br /> Y E Y F <br />CEI Services Team Lead <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 81