|
E
<br />MS, Civil Engineering: Structural
<br />Florida International University
<br />BS, Civil Engineering
<br />University of Florida
<br />L C
<br />L C
<br />Florida Professional Engineer (PE)
<br />#59446
<br />FDOT CTQP
<br />TIN # 21840
<br />Earthwork Construction Inspection Level 1
<br />Earthwork Construction Inspection Level 2
<br />Final Estimates Level 1
<br />Final Estimates Level 2
<br />QC Manager
<br />FDOT TTC/MOT
<br />Advanced #659778
<br />FEMA
<br />IS-100IS-100, IS-200, IS-700, IS-800 TS-G1 EOC, TS-G275 Operations
<br />Other
<br />IMSA Traffi c Signal Level 1
<br />FDOT Emergency Response
<br />W H
<br /> Construction Engineering and Inspections Lead
<br />Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company
<br />2018 – Present
<br />P E
<br /> Senior Project Engineer/Project Administrator
<br />Venetian Causeway HDD, Phase 2
<br />City of Miami Beach, FL
<br />Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and
<br />HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins,
<br />Fittings and Road Restoration to connect San Marco to San Marino, San
<br />Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. `
<br /> Senior Project Engineer/Project Administrator
<br />Sunset Isles HDD, Phase 2
<br />City of Miami Beach, FL
<br />Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and
<br />HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins,
<br />Fittings and Road Restoration to connect San Marco to San Marino, San
<br />Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. `
<br /> Senior Project Engineer
<br />I-75 Alligator Alley Environmental Education
<br />Project 43794-2-62-01, D4
<br />Broward County, FL
<br />I-75 Alligator Alley Rest Area at mile marker 30. Scope includes
<br />reconfi guration of parking lots, realignment of access road, drainage
<br />structures, utilities, lighting, construction of a four story timber
<br />observation tower, bridge boardwalks, picnic facilities, and exhibit
<br />wetland area.
<br /> Senior Project Engineer/Project Administrator
<br />Broward County Engineering and
<br />Signalization
<br />Broward County, FL
<br />Broward County Intersection re-construction of Foster Road, Tyler Road,
<br />and Fiber Optic Projects along Atlantic Blvd, Wiles Road Ph1,2, and
<br />Coconut Creek.
<br /> Senior Project Engineer/Project Administrator
<br />Indian Trace Roadway Improvement, West 192
<br />City of Weston, FL
<br />Project improvements included widening of roadway, turn lanes
<br />and extension of bicycle path, signalization cabinet foundation
<br />replacement, reconstruction of brick crosswalks with asphalt base,
<br />milling and resurfacing, pavement markings, including green bike
<br />lanes, and the installation of signing. In addition, the project included
<br />modifying existing drainage, and new curb and gutter construction,
<br />with new curb inlets. The sidewalks throughout the project were
<br />adjusted to accommodate ADA at the approaches and ramps. The
<br />project was 13,813 LF, or approximately 2.5 Miles long.
<br /> Senior Project Engineer
<br />23I-95 Safety Improvements 443847-1-52-01,D4, T4632
<br />Port St. Lucie, FL
<br />I-95 from Gatlin Blvd to Saint Lucie West. Scope included overbuild
<br />corrections on the super-elevated curves, widening of the ramps, a
<br />new safety curve system that lights curve directional signs when speed
<br />is exceed or rain/weather triggers the system. Also included drainage,
<br />lighting, bridge widening for lighting over SFWMD canal, ITS, DMS
<br />Truss, and milling and resurfacing.
<br /> Senior Project Engineer
<br />CEMEX; Schofi eld Road Improvements Lake County Permit
<br />Orange County, FL
<br />5.8 miles from US 27 to the Orange County. Line complete road
<br />reconstruction and re-alignment with a super elevated curve.
<br />Urban and Rural Construction, included excavation, embankment,
<br />stabilization and lime rock base, structural asphalt and friction, along
<br />with new curb inlets, drainage, ponds, outfalls, and swales. Earthwork
<br />was 25’ cuts and 25’ fi lls. A 96” Concrete Pipe was installed for CEMEX
<br />material conveyor system.
<br />,
<br />E P, PE
<br /> Y E Y F
<br />CEI Services Team Lead
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 81
|