|
E
<br />BS, Civil Engineering
<br />Polytechnic University
<br />Hato Rey, Puerto Rico
<br />L C
<br />Florida Professional Engineer (PE)
<br />#73249
<br />FDOT CTQP
<br />TIN #50500
<br />Concrete Field Inspector Level 2
<br />Drilled Shaft Inspection
<br />Earthwork Construction Inspection Level 1
<br />QC Manager
<br />FDOT TTC/MOT
<br />Advanced #604133
<br />Florida Stormwater, Erosion, and
<br />Sedimentation Control Inspector Program
<br />Qualifi ed Stormwater Management Inspector
<br />#35729
<br />W H
<br /> Project Administrator
<br />Calvin, Giordano & Associates, Inc., a
<br />SAFEbuilt Company
<br />2014 – Present
<br />P E
<br /> Project Administrator
<br />SE Drainage Project Phase I
<br />Dania Beach, Florida
<br />This retrofi t project is located east of US-1
<br />between 2nd Ave. and 5th Ave. and it will
<br />reduce the duration and severity of fl ooding
<br />during routine rain events and improve
<br />residents’ quality of life. The improvements
<br />include exfi ltration trenches, pump stations,
<br />and injection wells prior to connecting to the
<br />existing outfall.
<br /> Senior Project Engineer
<br />FDOT District 4: SR-848 Stirling Road from
<br />W Of N 58th Ave to US-1
<br />FDOT District 4, Florida
<br />The ongoing Stirling Road RRR project
<br />along SR 848 in Broward County, from
<br />Hollywood to Dania Beach, includes
<br />milling and resurfacing, pedestrian safety
<br />enhancements, and intersection upgrades.
<br />Scope covers new mast arms, rewiring,
<br />pedestrian signals, power upgrades,
<br />signage, roadway widening, curb and gutter,
<br />drainage, median reconstruction, and new
<br />curb ramps.
<br /> Project Administrator
<br />I-75 Alligator Alley Environmental Education
<br />Project 43794-2-62-01, D4
<br />Broward County, FL
<br />I-75 Alligator Alley Rest Area at mile marker
<br />30. Scope includes reconfi guration of
<br />parking lots, realignment of access road,
<br />drainage structures, utilities, lighting,
<br />construction of a four story timber
<br />observation tower, bridge boardwalks,
<br />picnic facilities, and exhibit wetland area.
<br /> Project Administrator
<br />Victoria Park Phase A (Project No. 10850)
<br />& Phase B (Project No. 11901) Watermain
<br />Improvements
<br />Fort Lauderdale, FL
<br />Elements included installing approximately
<br />60,000 feet of 6-inch and 8-inch watermain
<br />to replace existing 2-inch mains, including
<br />new fi re hydrants, service connections to
<br />each home, and repaving of the roads
<br />impacted by the watermain improvements.
<br /> Project Administrator
<br />General Assigned Contract; CA630; TWO #5;
<br />Project FM #445958-1-62-01
<br />FDOT District 6, FL
<br />This TWO provided support to District
<br />construction.
<br /> Project Administrator
<br />Florida’s Turnpike Enterprise; South Florida
<br />DMS Improvement and Replacement
<br />Location
<br />Homestead, FL
<br />Demolition and construction of 17 new
<br />ADMS Cantilevered Structures, CCTV
<br />camera poles, power services, ITS cabinets
<br />with transfer switch, and generator pads,
<br />along the approach streets to Sawgrass
<br />Expressway, Homestead exits at 288 Street
<br />and 137 Avenue, and Lake Worth Road.
<br /> Project Administrator
<br />NW 110th Ave Road Improvements; Project
<br />FM #435088-1-58-01
<br />Coral Springs, FL
<br />Contract elements included narrowing
<br />the existing 12-foot travel lanes to 11 feet
<br />and constructing a 6-foot wide sidewalk,
<br />a 4-foot bicycle lane, a drainage structure,
<br />installation, and curbing.
<br /> Project Administrator
<br />US-1 Lighting Project from 24th St to A1A
<br />FDOT District 4, FL
<br />Project included new LED street lighting
<br />and retrofi tting of existing lighting to LED
<br />fi xtures.
<br /> Project Administrator
<br />I-95/Pembroke Road Interchange
<br />Improvements
<br />FDOT District 4, FL
<br />Project included the installation of 8 new
<br />mast arms for signalization, installation
<br />of new lighting systems, widening the
<br />southbound and northbound I-95 off-
<br />ramps, guardrail installation, drainage
<br />improvements, milling, and resurfacing.
<br /> Project Administrator
<br />Hallandale Beach Boulevard (from RR
<br />Crossing to Ansin Boulevard)
<br />FDOT District 4, FL
<br />Project included the installation of 8 new
<br />mast arms for signalization, installation
<br />of new lighting systems, extending the
<br />southbound I-95 off-ramp, widening of
<br />the northbound I-95 off-ramp, guardrail
<br />replacement, drainage improvements,
<br />milling, and resurfacing.
<br /> Project Administrator
<br />US-441 (from 29th Street to North Oakland
<br />Park Boulevard)
<br />FDOT District 4, FL
<br />Project included the reconstruction of
<br />Hollywood Blvd (two travel lanes in each
<br />direction) to improve drainage, the addition
<br />of a median, outside parallel parking,
<br />6-feet wide bike lanes, construction of new
<br />12-feet wide sidewalks, tree planters, new
<br />signalization system, and new lighting
<br />system.
<br />H DS, PE, BSCE
<br />CEI Senior Project Engineer
<br /> Y E Y F E-S B
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 82
|