Laserfiche WebLink
E <br />BS, Civil Engineering <br />Polytechnic University <br />Hato Rey, Puerto Rico <br />L C <br />Florida Professional Engineer (PE) <br />#73249 <br />FDOT CTQP <br />TIN #50500 <br />Concrete Field Inspector Level 2 <br />Drilled Shaft Inspection <br />Earthwork Construction Inspection Level 1 <br />QC Manager <br />FDOT TTC/MOT <br />Advanced #604133 <br />Florida Stormwater, Erosion, and <br />Sedimentation Control Inspector Program <br />Qualifi ed Stormwater Management Inspector <br />#35729 <br />W H <br /> Project Administrator <br />Calvin, Giordano & Associates, Inc., a <br />SAFEbuilt Company <br />2014 – Present <br />P E <br /> Project Administrator <br />SE Drainage Project Phase I <br />Dania Beach, Florida <br />This retrofi t project is located east of US-1 <br />between 2nd Ave. and 5th Ave. and it will <br />reduce the duration and severity of fl ooding <br />during routine rain events and improve <br />residents’ quality of life. The improvements <br />include exfi ltration trenches, pump stations, <br />and injection wells prior to connecting to the <br />existing outfall. <br /> Senior Project Engineer <br />FDOT District 4: SR-848 Stirling Road from <br />W Of N 58th Ave to US-1 <br />FDOT District 4, Florida <br />The ongoing Stirling Road RRR project <br />along SR 848 in Broward County, from <br />Hollywood to Dania Beach, includes <br />milling and resurfacing, pedestrian safety <br />enhancements, and intersection upgrades. <br />Scope covers new mast arms, rewiring, <br />pedestrian signals, power upgrades, <br />signage, roadway widening, curb and gutter, <br />drainage, median reconstruction, and new <br />curb ramps. <br /> Project Administrator <br />I-75 Alligator Alley Environmental Education <br />Project 43794-2-62-01, D4 <br />Broward County, FL <br />I-75 Alligator Alley Rest Area at mile marker <br />30. Scope includes reconfi guration of <br />parking lots, realignment of access road, <br />drainage structures, utilities, lighting, <br />construction of a four story timber <br />observation tower, bridge boardwalks, <br />picnic facilities, and exhibit wetland area. <br /> Project Administrator <br />Victoria Park Phase A (Project No. 10850) <br />& Phase B (Project No. 11901) Watermain <br />Improvements <br />Fort Lauderdale, FL <br />Elements included installing approximately <br />60,000 feet of 6-inch and 8-inch watermain <br />to replace existing 2-inch mains, including <br />new fi re hydrants, service connections to <br />each home, and repaving of the roads <br />impacted by the watermain improvements. <br /> Project Administrator <br />General Assigned Contract; CA630; TWO #5; <br />Project FM #445958-1-62-01 <br />FDOT District 6, FL <br />This TWO provided support to District <br />construction. <br /> Project Administrator <br />Florida’s Turnpike Enterprise; South Florida <br />DMS Improvement and Replacement <br />Location <br />Homestead, FL <br />Demolition and construction of 17 new <br />ADMS Cantilevered Structures, CCTV <br />camera poles, power services, ITS cabinets <br />with transfer switch, and generator pads, <br />along the approach streets to Sawgrass <br />Expressway, Homestead exits at 288 Street <br />and 137 Avenue, and Lake Worth Road. <br /> Project Administrator <br />NW 110th Ave Road Improvements; Project <br />FM #435088-1-58-01 <br />Coral Springs, FL <br />Contract elements included narrowing <br />the existing 12-foot travel lanes to 11 feet <br />and constructing a 6-foot wide sidewalk, <br />a 4-foot bicycle lane, a drainage structure, <br />installation, and curbing. <br /> Project Administrator <br />US-1 Lighting Project from 24th St to A1A <br />FDOT District 4, FL <br />Project included new LED street lighting <br />and retrofi tting of existing lighting to LED <br />fi xtures. <br /> Project Administrator <br />I-95/Pembroke Road Interchange <br />Improvements <br />FDOT District 4, FL <br />Project included the installation of 8 new <br />mast arms for signalization, installation <br />of new lighting systems, widening the <br />southbound and northbound I-95 off- <br />ramps, guardrail installation, drainage <br />improvements, milling, and resurfacing. <br /> Project Administrator <br />Hallandale Beach Boulevard (from RR <br />Crossing to Ansin Boulevard) <br />FDOT District 4, FL <br />Project included the installation of 8 new <br />mast arms for signalization, installation <br />of new lighting systems, extending the <br />southbound I-95 off-ramp, widening of <br />the northbound I-95 off-ramp, guardrail <br />replacement, drainage improvements, <br />milling, and resurfacing. <br /> Project Administrator <br />US-441 (from 29th Street to North Oakland <br />Park Boulevard) <br />FDOT District 4, FL <br />Project included the reconstruction of <br />Hollywood Blvd (two travel lanes in each <br />direction) to improve drainage, the addition <br />of a median, outside parallel parking, <br />6-feet wide bike lanes, construction of new <br />12-feet wide sidewalks, tree planters, new <br />signalization system, and new lighting <br />system. <br />H DS, PE, BSCE <br />CEI Senior Project Engineer <br /> Y E Y F E-S B <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 82