Laserfiche WebLink
E <br />BS, Civil Engineering <br />University of Puerto Rico <br />L C <br />OSHA <br />OSHA 30 HR Construction Safety and Health <br />OSHA 29 CFR 1926 Certifi cation <br />NRC <br />Nuclear Radiation Safety Certifi cate <br />Sunshine 811 <br />811 Sunshine Locate Certifi cate <br />P E <br /> Backup Project Manager <br />Indian Trace Roadway Improvement, West 192 <br />Weston, FL <br />2025 – Ongoing <br />Project improvements included roadway <br />widening, new turn lanes, bicycle path <br />extension, signalization cabinet foundation <br />replacement, brick crosswalk reconstruction, <br />milling and resurfacing, and new pavement <br />markings with green bike lanes. <br />Scope also covered drainage modifi cations, <br />new curb and gutter with inlets, expanded <br />parking bays for school crossing guards, a <br />new brick-paver parking area with D-curb, <br />and ADA-compliant sidewalk adjustments. <br />Project length: 13,813 LF (2.5 miles). <br /> Project Administrator <br />Venetian Causeway HDD, Phase 2 <br />Miami Beach, FL <br />2024 – Ongoing <br />Performed horizontal directional drilling <br />(HDD) for 36” HDPE water main (5,300 <br />LF) and 12” HDPE force main (2,600 <br />LF), including tie-ins, fi ttings, and road <br />restoration. <br />Connected key utility segments: San Marco <br />to San Marino, San Marino to Di Lido, Di Lido <br />to Rivo Alto, and Bell Isle to Miami Beach. <br /> Project Administrator/Project Manager <br />Indian Creek Seawall <br />Miami Beach, FL <br />2025 <br />Managed installation of a new seawall over <br />an existing structure at Jefferson Avenue on <br />the Collins Canal, utilizing precast concrete <br />piles and structural wall panels. <br />Oversaw rubble riprap placement, cast- <br />in-place wall cap, and backfi ll, as well as <br />demolition, repairs, and modifi cations to <br />adjacent seawalls. <br />Coordinated vibration testing, settlement <br />monitoring, utility and irrigation <br />adjustments, tree removal, and restoration <br />of sidewalks, curbs, and road resurfacing to <br />ensure project compliance and structural <br />integrity. <br /> Backup Project Manager <br />Canal Bank Stabilization Phase 3 <br />Improvements <br />Miami Lakes, FL <br />2024 – 2025 <br />Managed stabilization of approximately <br />4,500 linear feet of the Golden Glades Canal <br />south bank using a stacked Canal Bank <br />Stabilization (CBS) system. <br />Oversaw excavation, canal leveling, concrete <br />CBS cell construction, bank and cell fi lling <br />with stone and select materials, geofabric <br />installation, and turf restoration. Adapted <br />to fi eld conditions with on-site redesign of <br />deeper-than-expected bank walls. <br />Coordinated construction from barges due <br />to limited site access, ensuring compliance <br />with design elevations and environmental <br />protection measures. <br /> Senior Inspector <br />Henedon Bridge Restoration <br />Miami Beach, FL <br />2024 <br />Performed spall and crack repairs on both <br />the topside and underside of the bridge <br />deck, replaced sidewalks, repaired steel <br />reinforcement as needed, and restored <br />pedestrian railings. <br />Addressed concrete pile spalls and <br />defi ciencies in beams and columns to <br />ensure structural integrity. <br /> Project Administrator <br />Landscape Installation <br />Miami-Dade County, FL <br />2020 – 2023 <br />The Florida Department of Transportation <br />(FDOT) carried out a landscaping project <br />along SR 924/NW 119th Street in Miami- <br />Dade County. The scope of work included <br />the installation of approximately 2,000 <br />small plants and 82 Solitaire Palm Trees <br />within the median throughout the project <br />limits. <br /> Project Administrator <br />Landscape Installation <br />Miami-Dade County, FL <br />2021 – 2022 <br />Project along SR 826/Palmetto Expressway, <br />extending from NW 31st Street to just <br />north of NW 74th Street, including the FEC <br />Railroad corridor. <br /> Project Administrator <br />Pedestrian Lighting Retrofi t <br />Miami-Dade County, FL <br />2021 – 2022 <br />The project encompassed intersection <br />improvement work at multiple locations <br />within Miami-Dade County. Key project <br />limits included SR 826/NE 163rd Street, <br />NW/NE 167th Street, and NW 81st Street/ <br />NW 82nd Street. <br />C R-P, BSCE <br />CEI Project Administrator <br /> Y E Y F E-S BCR <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 83