E
<br />BS, Civil Engineering
<br />University of Puerto Rico
<br />L C
<br />OSHA
<br />OSHA 30 HR Construction Safety and Health
<br />OSHA 29 CFR 1926 Certifi cation
<br />NRC
<br />Nuclear Radiation Safety Certifi cate
<br />Sunshine 811
<br />811 Sunshine Locate Certifi cate
<br />P E
<br /> Backup Project Manager
<br />Indian Trace Roadway Improvement, West 192
<br />Weston, FL
<br />2025 – Ongoing
<br />Project improvements included roadway
<br />widening, new turn lanes, bicycle path
<br />extension, signalization cabinet foundation
<br />replacement, brick crosswalk reconstruction,
<br />milling and resurfacing, and new pavement
<br />markings with green bike lanes.
<br />Scope also covered drainage modifi cations,
<br />new curb and gutter with inlets, expanded
<br />parking bays for school crossing guards, a
<br />new brick-paver parking area with D-curb,
<br />and ADA-compliant sidewalk adjustments.
<br />Project length: 13,813 LF (2.5 miles).
<br /> Project Administrator
<br />Venetian Causeway HDD, Phase 2
<br />Miami Beach, FL
<br />2024 – Ongoing
<br />Performed horizontal directional drilling
<br />(HDD) for 36” HDPE water main (5,300
<br />LF) and 12” HDPE force main (2,600
<br />LF), including tie-ins, fi ttings, and road
<br />restoration.
<br />Connected key utility segments: San Marco
<br />to San Marino, San Marino to Di Lido, Di Lido
<br />to Rivo Alto, and Bell Isle to Miami Beach.
<br /> Project Administrator/Project Manager
<br />Indian Creek Seawall
<br />Miami Beach, FL
<br />2025
<br />Managed installation of a new seawall over
<br />an existing structure at Jefferson Avenue on
<br />the Collins Canal, utilizing precast concrete
<br />piles and structural wall panels.
<br />Oversaw rubble riprap placement, cast-
<br />in-place wall cap, and backfi ll, as well as
<br />demolition, repairs, and modifi cations to
<br />adjacent seawalls.
<br />Coordinated vibration testing, settlement
<br />monitoring, utility and irrigation
<br />adjustments, tree removal, and restoration
<br />of sidewalks, curbs, and road resurfacing to
<br />ensure project compliance and structural
<br />integrity.
<br /> Backup Project Manager
<br />Canal Bank Stabilization Phase 3
<br />Improvements
<br />Miami Lakes, FL
<br />2024 – 2025
<br />Managed stabilization of approximately
<br />4,500 linear feet of the Golden Glades Canal
<br />south bank using a stacked Canal Bank
<br />Stabilization (CBS) system.
<br />Oversaw excavation, canal leveling, concrete
<br />CBS cell construction, bank and cell fi lling
<br />with stone and select materials, geofabric
<br />installation, and turf restoration. Adapted
<br />to fi eld conditions with on-site redesign of
<br />deeper-than-expected bank walls.
<br />Coordinated construction from barges due
<br />to limited site access, ensuring compliance
<br />with design elevations and environmental
<br />protection measures.
<br /> Senior Inspector
<br />Henedon Bridge Restoration
<br />Miami Beach, FL
<br />2024
<br />Performed spall and crack repairs on both
<br />the topside and underside of the bridge
<br />deck, replaced sidewalks, repaired steel
<br />reinforcement as needed, and restored
<br />pedestrian railings.
<br />Addressed concrete pile spalls and
<br />defi ciencies in beams and columns to
<br />ensure structural integrity.
<br /> Project Administrator
<br />Landscape Installation
<br />Miami-Dade County, FL
<br />2020 – 2023
<br />The Florida Department of Transportation
<br />(FDOT) carried out a landscaping project
<br />along SR 924/NW 119th Street in Miami-
<br />Dade County. The scope of work included
<br />the installation of approximately 2,000
<br />small plants and 82 Solitaire Palm Trees
<br />within the median throughout the project
<br />limits.
<br /> Project Administrator
<br />Landscape Installation
<br />Miami-Dade County, FL
<br />2021 – 2022
<br />Project along SR 826/Palmetto Expressway,
<br />extending from NW 31st Street to just
<br />north of NW 74th Street, including the FEC
<br />Railroad corridor.
<br /> Project Administrator
<br />Pedestrian Lighting Retrofi t
<br />Miami-Dade County, FL
<br />2021 – 2022
<br />The project encompassed intersection
<br />improvement work at multiple locations
<br />within Miami-Dade County. Key project
<br />limits included SR 826/NE 163rd Street,
<br />NW/NE 167th Street, and NW 81st Street/
<br />NW 82nd Street.
<br />C R-P, BSCE
<br />CEI Project Administrator
<br /> Y E Y F E-S BCR
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 83
|