Laserfiche WebLink
E <br />BS, Civil Engineering <br />University of Miami <br />L C <br />FDOT CTQP <br />Asphalt Paving Level 1 <br />Asphalt Paving Level 2 <br />Concrete Field Technician Level 1 <br />Drilled Shaft Inspection <br />Earthwork Construction Inspection Level 1 <br />Earthwork Construction Inspection Level 2 <br />Final Estimates Level 1 <br />Final Estimates Level 2 <br />Pile Driving Inspection <br />QC Manager <br />American Concrete Institute (ACI) <br />ACI Level 1 & Level 2 <br />International Municipal Signal Association <br />(IMSA) <br />IMSA Traffi c Signal Inspector Level 1 <br />Nuclear Gauge Safety Training / Nuclear <br />Radiation Safety <br />Florida Department of Environmental <br />Protection (FDEP) <br />Stormwater, Erosion and Sedimentation Control <br />Inspector <br />P E <br /> Senior Inspector / CSS <br />FDOT District 4: SR-848 Stirling Road from <br />W Of N 58th Ave to US-1 <br />FDOT District 4, Florida <br />The ongoing Stirling Road RRR project <br />along SR 848 in Broward County, from <br />Hollywood to Dania Beach, includes <br />milling and resurfacing, pedestrian safety <br />enhancements, and intersection upgrades. <br />Scope covers new mast arms, rewiring, <br />pedestrian signals, power upgrades, <br />signage, roadway widening, curb and gutter, <br />drainage, median reconstruction, and new <br />curb ramps. <br /> Senior Inspector <br />Indian Trace Roadway Improvement, West <br />192 <br />The project involved modifying existing <br />drainage, constructing new curb and gutter <br />with inlets, elongating school crossing guard <br />parking bays, and adding a new brick-paved <br />parking area bordered by D-curb. <br />Project improvements included roadway <br />widening, addition of turn lanes, and <br />extension of the bicycle path; signalization <br />cabinet foundation replacement; <br />reconstruction of brick crosswalks over <br />asphalt bases; milling and resurfacing; <br />pavement markings including green bike <br />lanes; and installation of signage. <br />Sidewalks were adjusted throughout to <br />meet ADA requirements at approaches and <br />ramps. The project spanned approximately <br />13,813 linear feet (2.5 miles). <br /> Senior Inspector <br />Weston Rd & Royal Palm Blvd Interchange <br />Improvement, West 224 <br />The project included new drainage, new curb <br />construction, median brick pavers, new bus <br />bay with brick pavers and lighting, median <br />and other landscaping and new irrigation <br />mainline reconstruction. <br />Project improvements included widening <br />of turn lanes and bicycle path, construction <br />of four new mast arms with foundations, <br />including one for signs close to the I-75 off <br />ramp. Also, reconstruction of brick crosswalks <br />with asphalt base, milling and resurfacing, <br />pavement markings, and installation of <br />signing. <br /> Senior Inspector <br />Project 2259921 Island Improvements <br />Scope included utility upgrades for residents <br />throughout the island, roadway drainage <br />improvements, overbuild corrections, new <br />curb and gutter, milling and resurfacing, <br />new driveways, and construction of a <br />specialized composite path with cast-in- <br />place concrete base and sides. <br />Work also involved demolition and <br />installation of median islands with <br />landscaping and irrigation, as well as new <br />specialized lighting throughout the island. <br />Given that the Village is known as the <br />‘Billionaire’s Bunker,’ the project required <br />careful resident communication and <br />coordination. <br /> Contract Support Specialist/Senior <br />Inspector <br />Hard Rock Stadium Pedestrian Bridges and <br />Tunnels <br />Project consisted of the construction of a <br />pedestrian bridge over the Turnpike exit <br />ramp and a pedestrian bridge over NW 199 <br />St and two tunnels under Don Shula Dr. <br /> Senior Inspector <br />FDOT District 4: I-75 Alligator Alley <br />Environmental Education Project <br />This project was located at the eastbound <br />rest area at mile marker 30 on I-75 (Alligator <br />Alley). Work included the construction of <br />educational amenities and improvements to <br />the existing facility, including reconfi gured <br />parking lots, realigned access road, drainage <br />structures, utilities, lighting, sidewalks, and <br />tree relocation. <br />The project featured a three-story <br />observation tower with elevated boardwalks <br />on a multi-span bridge supported by 200 <br />auger-cast foundations, as well as an exhibit <br />wetland area with educational signage, <br />stone walls, and geofabric. Additional <br />components included ITS DMS signs, CCTVs, <br />and wireless parking sensors. <br /> Contract Support Specialist/Senior <br />Inspector <br />Collins Ave (SR A1A) Decorative Lighting <br />(from Bayview Dr to 192 St) <br />A project that included the removal of <br />existing conventional lighting poles, <br />installation of new pole foundations or <br />rehabilitation of existing pole foundations, <br />installation of new decorative poles, <br />installation of electrical conduits and wires <br />and MOT supervision. <br /> Contract Support Specialist/Senior <br />Inspector <br />Florida’s Turnpike Enterprise <br />Project consisted of the demolition and <br />construction of 17 new ADMS Cantilevered <br />Structures, CCTV camera poles, power <br />services, ITS cabinets with transfer switch, <br />and generator pads, along the approach <br />streets to Sawgrass Expressway, Homestead <br />exits at 288 Street and 137 Avenue, and <br />Lake Worth Road. <br />A “R” S, BSCE <br />CEI Senior Inspector <br /> Y E Y FRS <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 84