<br /> CEI Senior Inspector
<br />Causeway Water Main and Sewer Main
<br />Replacement Phase 2
<br />Miami Beach, FL
<br />2024 – Ongoing
<br />Installed 5,300 LF of 36” HDPE water main
<br />and 2,600 LF of 12” HDPE force main
<br />using horizontal directional drilling (HDD),
<br />including tie-ins, fi ttings, and full road
<br />restoration.
<br /> Senior Inspector
<br />Causeway Water Main and Sewer Main
<br />Replacement Phase 2
<br />Miami Beach, FL
<br />2024 – Ongoing
<br />Installed 5,300 LF of 36” HDPE water
<br />main and 2,600 LF of 12” HDPE force
<br />main using horizontal directional drilling
<br />(HDD), including tie-ins, fi ttings, and road
<br />restoration.
<br /> Senior Inspector
<br />Venetian Causeway HDD, Phase 2
<br />Miami Beach, FL
<br />2024 – Ongoing
<br />Installed 5,300 LF of 36” HDPE water
<br />main and 2,600 LF of 12” HDPE force
<br />main using horizontal directional drilling
<br />(HDD), including tie-ins, fi ttings, and road
<br />restoration. Connected San Marco to San
<br />Marino, San Marino to Di Lido, Di Lido to
<br />Rivo Alto, and Bell Isle to Miami Beach.
<br /> Senior Inspector
<br />Jefferson Seawall
<br />Miami Beach, FL
<br />2023
<br />Installed a new seawall at Jefferson Avenue
<br />on the Collins Canal using plumb and batter
<br />precast concrete piles and precast structural
<br />wall panels, including rubble riprap, cast-in-
<br />place wall caps with backfi ll, and concrete-
<br />fi lled gaps.
<br />Scope included demolition, repairs, and
<br />modifi cations to adjacent seawalls in a
<br />highly aggressive environment with strict
<br />environmental controls, including manatee
<br />monitoring and grate installation.
<br />Additional work included vibration testing,
<br />set verifi cations, tree and mangrove removal,
<br />utility and irrigation repairs or replacements,
<br />lighting adjustments, drainage, sidewalks,
<br />curbs, and resurfacing; walls were cast on-
<br />site by the contractor.
<br /> Senior Inspector
<br />Indian Creek Seawall
<br />Miami Beach, FL
<br />2025
<br />The work consisted of installing a new
<br />seawall over an existing wall with plumb
<br />and batter cast precast concrete piles and
<br />pre-cast structural wall panels at Jefferson
<br />Avenue on the Collins Canal. The scope
<br />included rubble rip rap, a cast-in-place
<br />concrete wall cap with backfi ll and concrete
<br />fi lled gaps.
<br />It also included demolition, repairs,
<br />and modifi cation to existing adjacent
<br />seawall. Plus, vibration testing, settlement
<br />monitoring of structures, and set
<br />verifi cations, tree removal, repair or
<br />replacement of existing utilities or irrigation,
<br />lighting adjustment, drainage, sidewalk,
<br />curb, and resurfacing.
<br /> Senior Inspector
<br />77th St Bridge Repairs and Restoration
<br />Miami Beach, FL
<br />2024
<br />Performed spall and crack repairs on bridge
<br />deck topside and underside, as well as
<br />sidewalks; repaired steel reinforcement as
<br />needed, restored pedestrian railings, and
<br />addressed concrete pile defi ciencies using
<br />pile jacket repairs.
<br /> Senior Inspector
<br />Henendon Bridge Repairs and Restoration
<br />Miami Beach, FL
<br />2024
<br />Rehabilitated Bridge #876821 over
<br />Biscayne Point Waterway, addressing deck
<br />and roadway defi ciencies, spall repairs on
<br />abutments, bents, beams, and spans, and
<br />exposed rebar repairs.
<br />Executed longitudinal, transverse, and
<br />multi-directional crack repairs, pile spall
<br />and crack repairs, cleaning and painting
<br />of metal attachments on timber planks,
<br />and replacement of expansion joints and
<br />signage.
<br />Completed concrete deck, sidewalk, and
<br />curb repairs and replacements.
<br /> Senior Inspector
<br />Project 2259921, Island Improvements
<br />Indian Creek Village, FL
<br />2022 – 2023
<br />Delivered utility improvements for island
<br />residents, roadway drainage upgrades,
<br />overbuild corrections, new curb and gutter,
<br />milling and resurfacing, new driveways, and
<br />a specialized composite path with cast-in-
<br />place concrete base and sides.
<br />Managed demolition and installation of
<br />median islands with landscaping and
<br />irrigation, and implemented specialized
<br />lighting throughout the island.
<br />Project required careful resident
<br />communication and coordination in a
<br />high-profi le community known as the
<br />‘Billionaire’s Bunker.’
<br />J C M
<br /> CEI Senior Inspector
<br /> Y E Y FJM
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 85
|