Laserfiche WebLink
E <br />BS, Civil Engineering <br />National University, Colombia <br />L C <br />FDOT CTQP <br />TIN #26197 <br />Asphalt Paving Level 1 & 2 <br />Drilled Shaft Inspection <br />Earthwork Construction Inspection Level 1 & 2 <br />FDOT Concrete Field Inspector Specifi cation <br />Final Estimates Level 1 <br />QC Manager <br />P E <br /> CEI Senior Inspector <br />Causeway Water Main and Sewer Main <br />Replacement Phase 2 <br />Miami Beach, FL <br />2024 – Ongoing <br />Installed 5,300 LF of 36” HDPE water main <br />and 2,600 LF of 12” HDPE force main <br />using horizontal directional drilling (HDD), <br />including tie-ins, fi ttings, and full road <br />restoration. <br /> Senior Inspector <br />Causeway Water Main and Sewer Main <br />Replacement Phase 2 <br />Miami Beach, FL <br />2024 – Ongoing <br />Installed 5,300 LF of 36” HDPE water <br />main and 2,600 LF of 12” HDPE force <br />main using horizontal directional drilling <br />(HDD), including tie-ins, fi ttings, and road <br />restoration. <br /> Senior Inspector <br />Venetian Causeway HDD, Phase 2 <br />Miami Beach, FL <br />2024 – Ongoing <br />Installed 5,300 LF of 36” HDPE water <br />main and 2,600 LF of 12” HDPE force <br />main using horizontal directional drilling <br />(HDD), including tie-ins, fi ttings, and road <br />restoration. Connected San Marco to San <br />Marino, San Marino to Di Lido, Di Lido to <br />Rivo Alto, and Bell Isle to Miami Beach. <br /> Senior Inspector <br />Jefferson Seawall <br />Miami Beach, FL <br />2023 <br />Installed a new seawall at Jefferson Avenue <br />on the Collins Canal using plumb and batter <br />precast concrete piles and precast structural <br />wall panels, including rubble riprap, cast-in- <br />place wall caps with backfi ll, and concrete- <br />fi lled gaps. <br />Scope included demolition, repairs, and <br />modifi cations to adjacent seawalls in a <br />highly aggressive environment with strict <br />environmental controls, including manatee <br />monitoring and grate installation. <br />Additional work included vibration testing, <br />set verifi cations, tree and mangrove removal, <br />utility and irrigation repairs or replacements, <br />lighting adjustments, drainage, sidewalks, <br />curbs, and resurfacing; walls were cast on- <br />site by the contractor. <br /> Senior Inspector <br />Indian Creek Seawall <br />Miami Beach, FL <br />2025 <br />The work consisted of installing a new <br />seawall over an existing wall with plumb <br />and batter cast precast concrete piles and <br />pre-cast structural wall panels at Jefferson <br />Avenue on the Collins Canal. The scope <br />included rubble rip rap, a cast-in-place <br />concrete wall cap with backfi ll and concrete <br />fi lled gaps. <br />It also included demolition, repairs, <br />and modifi cation to existing adjacent <br />seawall. Plus, vibration testing, settlement <br />monitoring of structures, and set <br />verifi cations, tree removal, repair or <br />replacement of existing utilities or irrigation, <br />lighting adjustment, drainage, sidewalk, <br />curb, and resurfacing. <br /> Senior Inspector <br />77th St Bridge Repairs and Restoration <br />Miami Beach, FL <br />2024 <br />Performed spall and crack repairs on bridge <br />deck topside and underside, as well as <br />sidewalks; repaired steel reinforcement as <br />needed, restored pedestrian railings, and <br />addressed concrete pile defi ciencies using <br />pile jacket repairs. <br /> Senior Inspector <br />Henendon Bridge Repairs and Restoration <br />Miami Beach, FL <br />2024 <br />Rehabilitated Bridge #876821 over <br />Biscayne Point Waterway, addressing deck <br />and roadway defi ciencies, spall repairs on <br />abutments, bents, beams, and spans, and <br />exposed rebar repairs. <br />Executed longitudinal, transverse, and <br />multi-directional crack repairs, pile spall <br />and crack repairs, cleaning and painting <br />of metal attachments on timber planks, <br />and replacement of expansion joints and <br />signage. <br />Completed concrete deck, sidewalk, and <br />curb repairs and replacements. <br /> Senior Inspector <br />Project 2259921, Island Improvements <br />Indian Creek Village, FL <br />2022 – 2023 <br />Delivered utility improvements for island <br />residents, roadway drainage upgrades, <br />overbuild corrections, new curb and gutter, <br />milling and resurfacing, new driveways, and <br />a specialized composite path with cast-in- <br />place concrete base and sides. <br />Managed demolition and installation of <br />median islands with landscaping and <br />irrigation, and implemented specialized <br />lighting throughout the island. <br />Project required careful resident <br />communication and coordination in a <br />high-profi le community known as the <br />‘Billionaire’s Bunker.’ <br />J C M <br /> CEI Senior Inspector <br /> Y E Y FJM <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 85