E
<br />Weber State College, Ogden, UT
<br />Bachelor of Science, Manufacturing Egnineering
<br />Technology
<br />L C
<br />FDOT CTQP
<br />TIN #36998
<br />Drilled Shaft Inspection
<br />Earthwork Construction Inspection Level 2
<br />Final Estimates Level 1
<br />Pile Driving Inspection
<br />CGA P E
<br /> Senior Inspector
<br />Hard Rock Stadium Pedestrian Bridges and
<br />Tunnels
<br />Miami Gardens, FL
<br />2018 – 2020
<br />Project consisted of the construction of a
<br />pedestrian bridge over the Turnpike exit
<br />ramp and a pedestrian bridge over NW
<br />199 Street and two tunnels under Don
<br />Shula Drive. Scope of work included: pile
<br />foundations, MSE walls, erosion control,
<br />drainage improvements, lighting, future
<br />signalization improvements, signage and
<br />pavement markings, precast concrete,
<br />curb and gutter, ADA sidewalk/ramp
<br />reconstruction, landscaping, sod, irrigation,
<br />temporary traffi c control, parking lot
<br />modifi cation/ resurfacing, striping, and
<br />signing, plus pre-stressed, pre-cast concrete
<br />tunnel segments, excavation, coffer dam
<br />with steel sheet piles, dewatering, concrete,
<br />barrier wall, electrical, lighting, drainage
<br />and pumps. Complete construction was
<br />completed prior to 2020 Superbowl.
<br /> Senior Inspector
<br />City of Weston: Weston Rd & Royal Palm
<br />Blvd Interchange Improvement, West 224
<br />Weston, FL
<br />2023 - 2024
<br />Project improvements included widening
<br />of turn lanes and bicycle path, construction
<br />of four new mast arms with foundations,
<br />including one for signs close to the I-75 off
<br />ramp. Also, reconstruction of brick crosswalks
<br />with asphalt base, milling and resurfacing,
<br />pavement markings, and installation of
<br />signing. In addition, the project included
<br />new drainage, new curb construction,
<br />median brick pavers, new bus bay with
<br />brick pavers and lighting, median and other
<br />landscaping and new irrigation mainline
<br />reconstruction.
<br /> Senior Inspector
<br />Indian Creek Village: Island Improvements
<br />Indian Creek Village, FL
<br />2022 - 2023
<br />Scope included utility improvements
<br />to the island residents throughout the
<br />island, roadway drainage, overbuild
<br />corrections, new curb and gutter, milling and
<br />resurfacing, new driveways, new specialized
<br />composite path with cast-in-place concrete
<br />base and sides around the island.
<br />Demolition and installation of median
<br />islands with new landscape and irrigation.
<br />New specialized lighting throughout the
<br />island. The Village is also referred to as
<br />Billionaire’s Bunker, so it required good
<br />resident communication and awareness.
<br /> Senior Inspector
<br />Town of Miami Lakes: Royal Pointe Roadway
<br />Drainage Improvements
<br />Miami Lakes, FL
<br />2023 - 2024
<br />Project consisted of Royal Pointe
<br />neighborhood drainage improvement.
<br />Scope included adding new drainage
<br />structures, pipe, and French-drain systems
<br />to help reduce the fl ooding issues in the
<br />surrounding area. Improvements also
<br />included base reconstruction, sidewalk
<br />repairs, concrete driveways, concrete curb,
<br />milling and resurfacing of the work area,
<br />pavement markings, and restoration of
<br />disturbed landscaping and irrigation.
<br /> Senior Inspector
<br />Town of Miami Lakes: Alameda Northwest &
<br />W Lakes Gardens Drainage Improvements
<br />Miami Lakes, FL
<br />2023 - 2024
<br />Project consisted of Alameda Northwest and
<br />West Lakes Gardens 2nd Addition Drainage
<br />Improvements: Scope includes adding new
<br />drainage structures, pipe, and French-drain
<br />systems to help reduce the fl ooding issues
<br />in the surrounding area. Improvements
<br />also included base reconstruction, sidewalk
<br />repairs, concrete driveways, concrete curb,
<br />milling and resurfacing of the work area,
<br />pavement markings, and restoration of
<br />disturbed landscaping and irrigation.
<br /> Senior Inspector
<br />Town of Miami Lakes: Canal Bank
<br />Stabilization Phase 3 Improvements
<br />Miami Lakes, FL
<br />2024 - 2025
<br />Project consisted of improvements to
<br />the stabilization of the south side of the
<br />Golden Glades Canal using a stacked canal
<br />bank stabilization (CBS) system. The limits
<br />of the stabilization are from NW 92nd
<br />Avenue to the end installation of Phase
<br />II at center of the property 16930 NW
<br />83rd Avenue (approximately 4,500 total
<br />linear feet of canal bank). Scope included
<br />bank excavation, canal leveling, 57 stone
<br />leveling foundation, poured concrete CBS
<br />cells, 57 stone and select material bank
<br />and cell fi lling, geofabric installation for
<br />bank protection, turbidity protection, illegal
<br />irrigation caping, placement of fi ll and
<br />sod to conform to designed elevations.
<br />Contractor worked off barges due to limited
<br />workspace. Bank was deeper than shown, so
<br />wall was re-designed and fi eld built.
<br /> Senior Inspector
<br />FDOT District 6: CEI Services for Okeechobee
<br />Road 1
<br />FDOT District 6, FL
<br />2021 - 2023
<br />The improvements include adding
<br />acceleration and deceleration ramps
<br />and lanes including reconstruction of
<br />Okeechobee Road/SR
<br />25 with rigid pavement and fl exible
<br />pavement, ITS systems, signalization,
<br />lighting, relocation of existing trees and
<br />palms and drainage improvements from
<br />Broward County Line to W of Turnpike.
<br />M H
<br /> Y E Y F
<br /> CEI Senior InspectorMH
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 86
|