|
L C
<br />FDOT CTQP
<br />TIN #1000003852
<br />Asphalt Paving Level 1
<br />Auger Cast Pile Inspector
<br />Concrete Field Technician Level 1
<br />Drilled Shaft Inspection
<br />Earthwork Construction Inspection Level 1
<br />Earthwork Construction Inspection Level 2
<br />Pile Driving Inspection
<br />FDOT TTC/MOT
<br />Advanced #616950
<br />CGA P E
<br /> Senior Inspector
<br />Town of Miami Lakes: Canal Bank
<br />Stabilization Phase 3 Improvements
<br />Miami Lakes, FL
<br />2024 - 2025
<br />Project consisted of improvements to
<br />the stabilization of the south side of the
<br />Golden Glades Canal using a stacked canal
<br />bank stabilization (CBS) system. The limits
<br />of the stabilization are from NW 92nd
<br />Avenue to the end installation of Phase
<br />II at center of the property 16930 NW
<br />83rd Avenue (approximately 4,500 total
<br />linear feet of canal bank). Scope included
<br />bank excavation, canal leveling, 57 stone
<br />leveling foundation, poured concrete CBS
<br />cells, 57 stone and select material bank
<br />and cell fi lling, geofabric installation for
<br />bank protection, turbidity protection, illegal
<br />irrigation caping, placement of fi ll and
<br />sod to conform to designed elevations.
<br />Contractor worked off barges due to limited
<br />workspace. Bank was deeper than shown, so
<br />wall was re-designed and fi eld built.
<br />Senior Inspector
<br />City of Miami Beach: Henendon Bridge
<br />Repairs and Restoration
<br />Miami Beach, FL
<br />2024
<br />Bridge #876821 rehabilitation, over
<br />Biscayne Point Waterway. Scope included
<br />repairing deck top and roadway defi ciencies,
<br />spall repairs on abutments, bents, beams,
<br />and throughout spans, and repairing
<br />exposed re-bar. Repairing longitudinal,
<br />transverse, and multidirectional cracks
<br />throughout the entire bridge. Repairing
<br />spalls and cracks on piles. Cleaning
<br />corrosion and painting metal attachments
<br />on timber planks. Replacing expansion
<br />joints and signs. Repairing and replacing
<br />concrete deck, sidewalk and curb.
<br /> Senior Inspector
<br />Town of Miami Lakes: Royal Pointe Roadway
<br />Drainage Improvements
<br />Miami Lakes, FL
<br />2024
<br />Project consisted of Royal Pointe
<br />neighborhood drainage improvement.
<br />Scope included adding new drainage
<br />structures, pipe, and French-drain systems
<br />to help reduce the fl ooding issues in the
<br />surrounding area. Improvements also
<br />included base reconstruction, sidewalk
<br />repairs, concrete driveways, concrete curb,
<br />milling and resurfacing of the work area,
<br />pavement markings, and restoration of
<br />disturbed landscaping and irrigation.
<br /> Senior Inspector
<br />Town of Miami Lakes: Alameda Northwest &
<br />W Lakes Gardens Drainage Improvements
<br />Miami Lakes, FL
<br />2024
<br />Scope included adding new drainage
<br />structures, pipe, and French-drain systems
<br />to help reduce the fl ooding issues in the
<br />surrounding area. Improvements also
<br />included base reconstruction, sidewalk
<br />repairs, concrete driveways, concrete curb,
<br />milling and resurfacing of the work area,
<br />pavement markings, and restoration of
<br />disturbed landscaping and irrigation.
<br /> Senior Inspector
<br />Underline Project
<br />Miami-Dade County, FL
<br />2025 - Ongoing
<br />The Underline is transforming the land
<br />below Miami-Dade’s Metrorail into a 10-
<br />mile linear park, urban trail, and public art
<br />destination.
<br />P-CGA P E
<br /> Bridge Inspector
<br />FDOT District 6: I-395 MacArthur Causeway
<br />Bridge Reconstruction
<br />Miami-Dade County, FL
<br />2019 - 2024
<br />The I-395/SR 836/I-95 Project is a
<br />partnership between FDOT and the Greater
<br />Miami Expressway Agency (GMX), with
<br />construction limits on State Road (SR)
<br />836 beginning at NW 17 Avenue and
<br />continuing through the SR 836/I-395/I-95
<br />(Midtown)Interchange to the MacArthur
<br />Inspector Causeway Bridge. The limits on
<br />I-95 (from NW 8 Street to NW 29 Street).
<br />Duties included inspections on essential
<br />structures including drilled shafts, driven
<br />piles, Auger Cast Piles, Bridge Deck concrete
<br />pours, and mass concrete structures. Assisted
<br />management the coordination of the daily
<br />schedules of concrete testing technicians,
<br />ensuring adherence to project plans and
<br />specifi cations. Collaborated with the CEI
<br />team and contractors to troubleshoot and
<br />resolve issues that arose, maintaining
<br />seamless coordination.
<br /> Inspector
<br />FDOT District 4: I-95 3C Express Lanes (S of
<br />Hollywood Blvd to S of Broward Blvd)
<br />Broward County, FL
<br />2019 - 2024
<br />Reconstruction, milling, resurfacing,
<br />overbuild, widening, and/or restriping of
<br />I-95 for 9 miles including one additional
<br />Express Lane in each direction (2 lanes total
<br />in each direction). A southbound Express
<br />Lanes entrance and a northbound Express
<br />Lanes exit location, serving Sheridan Street
<br />and interchanging to the north for traffi c to
<br />and from the south. A northbound Express
<br />Lanes entrance and a southbound Express
<br />Lanes exit location, serving Sheridan Street
<br />and interchanges to the south for traffi c to
<br />and from the north. Construction of dual
<br />exits for the northbound and southbound
<br />exit ramps to Sheridan Street. Dual right turn
<br />lane improvements at the ramp terminal for
<br />the I-95 northbound exit ramp movement
<br />to eastbound Griffi n Road. I-95/I-595 Direct
<br />Connectors between northbound and
<br />southbound 95 Express Lanes and I-595, to
<br />and from the west.
<br />L B
<br /> Y E Y F
<br /> CEI Senior InspectorLB
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 87
|