Laserfiche WebLink
L C <br />FDOT CTQP <br />TIN #1000003852 <br />Asphalt Paving Level 1 <br />Auger Cast Pile Inspector <br />Concrete Field Technician Level 1 <br />Drilled Shaft Inspection <br />Earthwork Construction Inspection Level 1 <br />Earthwork Construction Inspection Level 2 <br />Pile Driving Inspection <br />FDOT TTC/MOT <br />Advanced #616950 <br />CGA P E <br /> Senior Inspector <br />Town of Miami Lakes: Canal Bank <br />Stabilization Phase 3 Improvements <br />Miami Lakes, FL <br />2024 - 2025 <br />Project consisted of improvements to <br />the stabilization of the south side of the <br />Golden Glades Canal using a stacked canal <br />bank stabilization (CBS) system. The limits <br />of the stabilization are from NW 92nd <br />Avenue to the end installation of Phase <br />II at center of the property 16930 NW <br />83rd Avenue (approximately 4,500 total <br />linear feet of canal bank). Scope included <br />bank excavation, canal leveling, 57 stone <br />leveling foundation, poured concrete CBS <br />cells, 57 stone and select material bank <br />and cell fi lling, geofabric installation for <br />bank protection, turbidity protection, illegal <br />irrigation caping, placement of fi ll and <br />sod to conform to designed elevations. <br />Contractor worked off barges due to limited <br />workspace. Bank was deeper than shown, so <br />wall was re-designed and fi eld built. <br />Senior Inspector <br />City of Miami Beach: Henendon Bridge <br />Repairs and Restoration <br />Miami Beach, FL <br />2024 <br />Bridge #876821 rehabilitation, over <br />Biscayne Point Waterway. Scope included <br />repairing deck top and roadway defi ciencies, <br />spall repairs on abutments, bents, beams, <br />and throughout spans, and repairing <br />exposed re-bar. Repairing longitudinal, <br />transverse, and multidirectional cracks <br />throughout the entire bridge. Repairing <br />spalls and cracks on piles. Cleaning <br />corrosion and painting metal attachments <br />on timber planks. Replacing expansion <br />joints and signs. Repairing and replacing <br />concrete deck, sidewalk and curb. <br /> Senior Inspector <br />Town of Miami Lakes: Royal Pointe Roadway <br />Drainage Improvements <br />Miami Lakes, FL <br />2024 <br />Project consisted of Royal Pointe <br />neighborhood drainage improvement. <br />Scope included adding new drainage <br />structures, pipe, and French-drain systems <br />to help reduce the fl ooding issues in the <br />surrounding area. Improvements also <br />included base reconstruction, sidewalk <br />repairs, concrete driveways, concrete curb, <br />milling and resurfacing of the work area, <br />pavement markings, and restoration of <br />disturbed landscaping and irrigation. <br /> Senior Inspector <br />Town of Miami Lakes: Alameda Northwest & <br />W Lakes Gardens Drainage Improvements <br />Miami Lakes, FL <br />2024 <br />Scope included adding new drainage <br />structures, pipe, and French-drain systems <br />to help reduce the fl ooding issues in the <br />surrounding area. Improvements also <br />included base reconstruction, sidewalk <br />repairs, concrete driveways, concrete curb, <br />milling and resurfacing of the work area, <br />pavement markings, and restoration of <br />disturbed landscaping and irrigation. <br /> Senior Inspector <br />Underline Project <br />Miami-Dade County, FL <br />2025 - Ongoing <br />The Underline is transforming the land <br />below Miami-Dade’s Metrorail into a 10- <br />mile linear park, urban trail, and public art <br />destination. <br />P-CGA P E <br /> Bridge Inspector <br />FDOT District 6: I-395 MacArthur Causeway <br />Bridge Reconstruction <br />Miami-Dade County, FL <br />2019 - 2024 <br />The I-395/SR 836/I-95 Project is a <br />partnership between FDOT and the Greater <br />Miami Expressway Agency (GMX), with <br />construction limits on State Road (SR) <br />836 beginning at NW 17 Avenue and <br />continuing through the SR 836/I-395/I-95 <br />(Midtown)Interchange to the MacArthur <br />Inspector Causeway Bridge. The limits on <br />I-95 (from NW 8 Street to NW 29 Street). <br />Duties included inspections on essential <br />structures including drilled shafts, driven <br />piles, Auger Cast Piles, Bridge Deck concrete <br />pours, and mass concrete structures. Assisted <br />management the coordination of the daily <br />schedules of concrete testing technicians, <br />ensuring adherence to project plans and <br />specifi cations. Collaborated with the CEI <br />team and contractors to troubleshoot and <br />resolve issues that arose, maintaining <br />seamless coordination. <br /> Inspector <br />FDOT District 4: I-95 3C Express Lanes (S of <br />Hollywood Blvd to S of Broward Blvd) <br />Broward County, FL <br />2019 - 2024 <br />Reconstruction, milling, resurfacing, <br />overbuild, widening, and/or restriping of <br />I-95 for 9 miles including one additional <br />Express Lane in each direction (2 lanes total <br />in each direction). A southbound Express <br />Lanes entrance and a northbound Express <br />Lanes exit location, serving Sheridan Street <br />and interchanging to the north for traffi c to <br />and from the south. A northbound Express <br />Lanes entrance and a southbound Express <br />Lanes exit location, serving Sheridan Street <br />and interchanges to the south for traffi c to <br />and from the north. Construction of dual <br />exits for the northbound and southbound <br />exit ramps to Sheridan Street. Dual right turn <br />lane improvements at the ramp terminal for <br />the I-95 northbound exit ramp movement <br />to eastbound Griffi n Road. I-95/I-595 Direct <br />Connectors between northbound and <br />southbound 95 Express Lanes and I-595, to <br />and from the west. <br />L B <br /> Y E Y F <br /> CEI Senior InspectorLB <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 87