Laserfiche WebLink
L C <br />FDOT CTQP <br />TIN # 41928 <br />Asphalt Paving Level 1 <br />Earthwork Construction Inspection Level 1 <br />Pile Driving Inspection <br />FDOT TTC/MOT <br />Advanced #603428 <br />P E <br /> Senior Inspector <br />Underline Project <br />Miami-Dade County, FL <br />2025 – Ongoing <br />The Underline is transforming the land below Miami-Dade’s Metrorail <br />into a 10-mile linear park, urban trail, and public art destination. <br /> Senior Inspector <br />Hard Rock Stadium Pedestrian Bridges and Tunnels <br />Miami Gardens, FL <br />2018 – 2020 <br />Constructed pedestrian bridges over the Turnpike exit ramp and NW <br />199 Street, plus two tunnels under Don Shula Drive. <br />Scope included pile foundations, MSE walls, erosion control, <br />drainage improvements, lighting, signalization, signage, pavement <br />markings, precast concrete, curb and gutter, ADA-compliant sidewalks/ <br />ramps, landscaping, irrigation, temporary traffi c control, parking lot <br />modifi cations, and pre-stressed precast tunnel segments. <br />Additional work involved excavation, cofferdam with steel sheet piles, <br />dewatering, concrete barrier walls, electrical, lighting, drainage, and <br />pumps. Completed prior to the 2020 Super Bowl. <br /> Lead Senior Inspector <br /> I-95 Safety Improvements, Gatlin Blvd to St. Lucie West <br />FDOT District 4, FL <br />2023 – 2024 <br />Performed roadway widening and overbuild corrections to super- <br />elevated curves, installed a new ITS safety curve system with speed and <br />weather sensors, and executed bridge widening for lighting over the <br />SFWMD canal. <br />Additional work included truss installations with DMS, lighting and <br />guardrail installation, and milling and resurfacing. <br /> Senior Inspector <br />I-75 Alligator Alley Environmental Education Project <br />FDOT District 4, FL <br />2021 – 2024 <br />Led improvements at the I-75 Alligator Alley Eastbound Rest Area (mile <br />30), including construction of educational amenities, reconfi gured <br />parking, realigned access roads, drainage, utilities, lighting, sidewalks, <br />and tree relocation. <br />Delivered a three-story observation tower with elevated boardwalks <br />on a multi-span bridge with 200 auger-cast foundations, an exhibit <br />wetland area with educational signage, and installed ITS DMS signs, <br />CCTV cameras, and wireless parking sensors. <br /> Senior Inspector <br />Schofi eld Road Improvements: CEMEX Four Corners Sand Mine <br />Lake County, FL <br />2021 – 2024 <br />Managed 5.8-mile roadway project from US 27 to the Orange County <br />Line, including new 4-lane Urban Design construction (US 27 to <br />Wellness Way) and 4.6-mile Rural Design (Wellness Way to county <br />line). <br />Scope included 15’ cuts and fi lls, road stabilization with clay soils and <br />lime-rock base, structural and friction paving on mainline and turn <br />lanes, paved shoulders, and new drainage system with curb, gutters, <br />inlets, cross drains, outfalls, and ponds. <br />Oversaw road realignment with super-elevated transitions and <br />coordination with existing utilities until new utilities were installed at <br />offsets. <br /> Senior Inspector <br />CEI Services for Okeechobee Road 1 <br />FDOT District 6, FL <br />2021 – 2023 <br />Improvements included adding new acceleration and deceleration <br />ramps and lanes, reconstructing Okeechobee Road/SR 25 with both <br />rigid and fl exible pavement, and installing ITS systems, signalization, <br />and lighting. <br />Scope also included drainage upgrades and relocation of existing trees <br />and palms along the corridor from the Broward County Line to west of <br />the Turnpike. <br />L R <br />CEI Senior Inspector <br /> Y E Y FLR <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 88