Laserfiche WebLink
L C <br />FDOT CTQP <br />TIN#1000002485 <br />Asphalt Paving Level 1 <br />Asphalt Paving Level 2 <br />Drilled Shaft Inspection <br />Earthwork Construction Inspection Level 1 <br />Final Estimates Level 1 <br />Final Estimates Level 2 <br />FDOT TTC/MOT <br />Advanced #655054 <br />FDOT IMSA <br />Traffi c Signal Bench Technician II <br />Traffi c Signal Inspector <br />Certifed Fiber Optic Technician <br />W H <br /> CEI Senior Inspector <br />Calvin, Giordano & Associates, Inc. <br />2022 – Present <br />P E <br /> Senior Inspector <br />Genesis Roadway Drainage Improvements <br />Miami Lakes, FL <br />2025 – Ongoing <br />Project consists of Genesis neighborhood <br />drainage improvement. Scope includes <br />adding new drainage structures, pipe, and <br />French-drain systems to help reduce the <br />fl ooding issues in the surrounding area. <br />Addressing utilities and confl icts, base <br />reconstruction, sidewalk repairs, concrete <br />driveways, milling and resurfacing of <br />the work area, pavement markings, and <br />restoration of disturbed landscaping and <br />irrigation. <br /> Senior Inspector <br />Indian Trace Roadway Improvement, West <br />192 <br />Weston, FL <br />2025 – Ongoing <br />Roadway widening with new turn lanes <br />and extended bicycle path, brick crosswalk <br />reconstruction, milling/resurfacing, <br />pavement markings, and updated signage. <br />Included drainage improvements, curb and <br />gutter installation, expanded parking areas, <br />and ADA-compliant sidewalks and ramps. <br />Total length: 13,813 LF (approx. 2.5 miles). <br /> Senior Inspector <br />FDOT District 4: SR-848 Stirling Road from <br />W Of N 58th Ave to US-1 <br />FDOT District 4, FL <br />2024 – Ongoing <br />Ongoing Stirling Road RRR project <br />on SR 848 in Broward County, from <br />Hollywood to Dania Beach, including <br />milling and resurfacing, pedestrian safety <br />improvements, and intersection upgrades. <br />Scope covers new mast arms, rewiring, <br />pedestrian signals, signage and lighting, <br />roadway widening, curb and gutter, <br />drainage, median reconstruction, and ADA- <br />compliant curb ramps. <br /> Senior Inspector <br />Weston Rd & Royal Palm Blvd Interchange <br />Improvement, West 224 <br />Weston, FL <br />2023 – 2024 <br />Project included widening turn lanes and <br />a bicycle path, constructing four mast arms <br />with foundations, and reconstructing brick <br />crosswalks. <br />Additional work comprised milling and <br />resurfacing, pavement markings, signage, <br />drainage and curb improvements, median <br />and bus bay brick pavers with lighting, <br />landscaping, and irrigation mainline <br />reconstruction. <br /> Senior Inspector <br />Project 2259921 Island Improvements <br />Indian Creek Village, FL <br />2022 – 2023 <br />Scope included utility upgrades, roadway <br />drainage improvements, curb and gutter <br />installation, milling and resurfacing, new <br />driveways, and a specialized composite path. <br />Additional work included landscaped <br />median islands with irrigation, new <br />specialized lighting, and careful resident <br />coordination due to the high-profi le <br />community. <br /> Senior Inspector <br />Jefferson Seawall <br />Miami Beach, FL <br />2023 <br />Installed a new precast concrete seawall <br />at Jefferson Avenue on the Collins Canal, <br />including rubble riprap, cast-in-place wall <br />cap, and modifi cations to adjacent seawalls. <br />Scope also included environmental <br />compliance (manatee monitoring, grates), <br />vibration testing, tree and mangrove <br />removal, utility and irrigation adjustments, <br />lighting, drainage, sidewalks, curbs, and <br />resurfacing. Walls were cast on site in a <br />highly aggressive environment. <br /> Senior Inspector <br />Canal Bank Stabilization Phase Improvements <br />Miami Lakes, FL <br />2024 – 2025 <br />Improved stabilization of the south side <br />of Golden Glades Canal (approx. 4,500 LF) <br />using a stacked canal bank stabilization <br />(CBS) system. <br />Scope included bank excavation, canal <br />leveling, poured concrete CBS cells, stone <br />and select material backfi ll, geofabric <br />installation, turbidity protection, fi ll and sod <br />placement, and adjustments for fi eld-built <br />wall due to deeper-than-expected bank. <br />Work was completed from barges due to <br />limited workspace. <br /> Inspector <br />Foster Road and NW 2nd Ave Intersection <br />Improvements <br />Broward County, FL <br />2022 – 2023 <br />This project consisted of drilled shafts with <br />mast arm installation and retrofi tting, <br />signization, milling and resurfacing, signing <br />and pavement markings, pedestrian <br />upgrades including signal and ADA detector <br />installation, pull boxes, and conduit <br />installation. <br /> Inspector <br />Pine Island Rd & Atlantic Blvd Fiber Optic <br />Improvements <br />Broward County, FL <br />2022 <br />This project consisted of fi ber optic <br />cable installation, pull box removal and <br />installation, concrete sidewalk removal and <br />replacement, and traffi c controller assembly <br />removal. <br />L R <br />CEI Senior Inspector <br /> Y E Y F E-S BLR <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 89