My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colliers Engineering & Design Bid Document (18)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Colliers Engineering & Design
>
Colliers Engineering & Design Bid Document (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:00:27 PM
Creation date
8/31/2026 12:59:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bryant Facey, PE <br />ProjectManager <br />Mr.FaceyisaSeniorProjectManagerandLeadWater/Wastewaterdesign <br />engineer with 20 years of experience in planning, design, permitting and <br />regulatory compliance, and construction administration of municipal civil <br />andutilityprojectsforgovernmentalclientsthroughoutFloridaandthe <br />Southeast.Pastprojectshaveincludedstandardandalternativedelivery <br />methodsofprojectstoimproveautilities’water,wastewater,andstormwater <br />infrastructure,rangingfromnewgreenfielddesignstoreplacement/ <br />rehabilitation of aging public infrastructure and treatment facilities. <br />Key Projects <br />South Stormwater Pump Station #1 Design <br />Broward County Aviation Dept. (BCAD) <br />Designprojecttodevelopconstructiondrawingsforanewgreenfield <br />stormwater pump station to aid in stormwater conveyance from the Fort <br />Lauderdale-HollywoodInternationalAirport.Projectwasfirstofitskindfor <br />BCAD and used as a template for future stormwater pump stations. Pumping <br />capacity was designed to move up to 60 cfs of water from the existing airport <br />stormwaterstoragesystemtotheadjacentcanalswithfinaldischargeto <br />theAtlanticOcean.Designscopeofprojectincludednewoversizedwetwell, <br />quadplex pump station, pipe and valve vault, energy dissipation structure <br />and tie in to an existing canal outfall structure. Design included local electrical <br />and controls systems and coordination with implementation into the airport’s <br />communication protocols. <br />Master Pump Station 300 Rehabilitation <br />Broward County, FL <br />Fasttrackdesignprojectforconversionandrehabilitationofalargeregional <br />master pump station for Broward County District 3A service area. Scope of <br />projectincludesconversionofawet/drypitwetwellpumpstationtoanin-line <br />wastewater booster station, including removal/replacement of solids handling <br />pumps, conversion of wet well into pipe gallery, rehabilitation and upgrades to <br />the electrical and controls systems, interior station renovations, and relocation <br />and replacement of an emergency generator. <br />East and West Booster Station Generator Replacement <br />City of Coral Springs, FL <br />Engineering services for the replacement and upgrade of two client potable <br />water distribution system booster pump stations emergency generators. <br />Projectscopeincludesreplacementofthestationgenerators,rehabilitation/ <br />modificationtotheancillaryfuel,exhaust,andelectricalsystemsaswell <br />as noise reduction material installation in a portion of the booster station <br />buildings. <br />Education <br />BS, Environmental Engineering, <br />University of Central Florida <br />Professional Registrations <br />Professional Engineer (PE): FL <br />Affiliations & Memberships <br />AWWA <br />FWEA <br />WEF <br />Colliers Engineering & Design 24
The URL can be used to link to this page
Your browser does not support the video tag.