|
EugeneCollings-Bonfill, PE, PSM
<br />Civil Engineering Lead
<br />Mr.Collings-Bonfill,PE,PSMbringsover26yearsofcomprehensiveexperience
<br />in the engineering and construction industry, with expertise spanning
<br />surveying,engineeringdesign,programandprojectmanagement,and
<br />construction oversight. His career has been largely focused on municipal
<br />infrastructure, with a strong emphasis on parks and public spaces. Notably,
<br />Mr.Collings-BonfillservedastheProgramManagerfortheCityofDoral’s
<br />Parks Bond Program, where he was responsible for the day-to-day planning,
<br />coordination,andexecutionofmultipleparkimprovementprojectsunderthe
<br />bondinitiative.Inthisrole,heledthesuccessfuldeliveryofthemajorityofthe
<br />City’sbond-fundedprojects,manyofwhichwerecompletedaheadofschedule
<br />and under budget. His proven ability to manage complex, multi-stakeholder
<br />projectswithinapublicagencyframeworkmakeshimuniquelyqualifiedto
<br />support the City of Fort Lauderdale’s Parks Bond Program. He understands
<br />theimportanceofaligningprojectdeliverywithbondcompliance,community
<br />expectations,andCityobjectives—ensuringtransparency,fiscalresponsibility,
<br />and timely execution across all phases of program implementation.
<br />Key Projects
<br />Stormwater Infrastructure and Associated Roadway Improvements, City of
<br />Miami, FL
<br />Mr.Collings-BonfillservedastheroadwayprojectmanagerfortheEdgewater
<br />Stormwater Improvements Design Criteria Package for stormwater
<br />infrastructureandassociatedroadwayimprovements.Thisincludednewand
<br />upsized stormwater inlets and pipes, lining of existing outfall pipes, stormwater
<br />pumpstationwithinjectionwells,roadwayreconstruction,millingand
<br />resurfacing,ADAramps,signageandpavementmarkings.Theprojectlimits
<br />are bounded by NE 24th Street on the North, NE 22nd Street to the South, NE
<br />4thAvenuetotheWest,andBiscayneBaytotheEast.Thestormwaterpump
<br />station location is anticipated in the vicinity of NE 4th Avenue and NE 23rd
<br />Terrace.
<br />Village of Biscayne Park Drainage Improvements, Biscayne Park, FL
<br />Scope consisted of providing design-build professional engineering services
<br />for the design, permitting, and limited construction services of stormwater
<br />improvementswithintheBiscayneParkNeighborhood.Theprojectisbounded
<br />by NW 89th Court (West), NW 167th Street (North), NW 87th Court (East),
<br />andNW166thTerrace(South).Theprojectincludesapproximately3,500LF
<br />of roadway milling and resurfacing, and approximately 2,600 LF of drainage
<br />improvements,includingHDPEpipesandexfiltrationtrench.
<br />Doral Cultural Arts Center, Doral, FL
<br />ThedesignandconstructionofDoral’sfirstdedicated,culturalartsfacilityat
<br />DowntownDoralPark.TheDoralCulturalArtsPavilionwillservetocelebrate
<br />the unique culture of Doral, as well as the variety of cultures, arts, and
<br />experiences embraced by the city’s residents. At approximately 9,000 square
<br />feet, the Doral Cultural Arts Pavilion is envisioned to be the hub of cultural
<br />and performing arts in Doral and will be supported by satellite programming
<br />locations at both Doral Central Park and Doral Legacy Park.
<br />Education
<br />BS, Civil Engineering, University
<br />of Miami, 2011
<br />MS, Civil Engineering, University
<br />of Miami, 2013
<br />MBA, Florida International
<br />University, 2022
<br />Professional Registrations
<br />Professional Engineer (PE), FL,
<br />TX, GA, LA
<br />Professional Surveyor and
<br />Mapper (PSM), FL
<br />DBIA (D-3135) – Design Build
<br />Institute of America
<br />PMP (#1620796) – Project
<br />Management Professional
<br />Certified Floodplain Manager
<br />Colliers Engineering & Design 27
|