My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colliers Engineering & Design Bid Document (18)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Colliers Engineering & Design
>
Colliers Engineering & Design Bid Document (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:00:27 PM
Creation date
8/31/2026 12:59:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Page 3 | 4 <br />or the performance of services pursuant to this Bid and / or from any procurement decision of the <br />City including without limitation, awarding the Contract to the Proposer. <br />Reason for Indemnification Exception : <br />As a professional services provider, our professional liability insurance does not cover the <br />negligence of other parties. We request the defense carveout specifically as it relates to professional <br />liability claims from the duty to defend because the market place for professional liability insurance <br />will not provide a defense to a professional negligence claim that has been levied against a non - <br />professional entity. As such, if a defense is tendered to both our professional and general liability <br />policies, they will inevitably both deny the defense and seek the other to provide the defense. If the <br />carveout is accepted, our general liability provides defense, and if the claim is determined to arise <br />out of our professional negligence, our professional liability will provide a full indemnification, <br />including attorneys’ fees and costs. We also kindly request that liability is limited to the percentage <br />of fault to the extent that such losses, expenses, demands, actions and claims are due to <br />Consultant’s negligent performance. <br /> <br />Proposed Exceptions to Special Terms and Conditions <br /> <br /> <br />Intentionally Omitted. Delay Damages (Liquidated Damages). As to the awarded Agreement, or <br />Project Agreements or Letter Agreements, that have deadlines, time will be of the essence unless <br />stated otherwise. In the event the work or Services are not completed within the time specified, <br />the City will suffer damages, the amount of which is difficult if not impossible to ascertain. It is <br />agreed, therefore, that from the compensation otherwise to be paid to the Consultant, the City <br />may retain the sum of FIVE HUNDRED Dollars ($500.00) per calendar day for each day thereaf ter, <br />Sundays and holidays included, that the Work or Services remains uncompleted. This sum shall <br />represent liquidated damages that the City will have sustained per calendar day from the <br />inconvenience and expense caused to the City by the delay in the comp letion of the Work or <br />Services. This sum is not a penalty, being the liquidated damages the City will have sustained in <br />event of such default by the Consultant. The City reserves the right to additionally recover direct <br />expenses incurred during the period of any delay. The Consultant shall be liable for liquidated <br />damages even if the Agreement, Project Agreement, or Letter Agreement is terminated by the <br />City for cause or if the Consultant abandons the Work or Services. <br />Reason for Liquidated Damages Exception <br />If a dispute arises over delay damages, the City shall have the burden of substantiating the damages <br />associated with the delay. <br /> <br />2.10.1 Comprehensive General Liability Insurance <br />ŽŶƐƵůƚĂŶƚƐŚĂůůďĞƌĞƋƵŝƌĞĚƚŽƉƵƌĐŚĂƐĞ͕ŵĂŝŶƚĂŝŶ͕ĂŶĚŬĞĞƉŝŶĨƵůůĨŽƌĐĞ͕ĞĨĨĞĐƚ͕ĂŶĚŐŽŽĚƐƚĂŶĚŝŶŐ͕ <br />ŽŵƉƌĞŚĞŶƐŝǀĞ'ĞŶĞƌĂů>ŝĂďŝůŝƚLJǁŝƚŚƉƌŝŵĂƌLJůŝŵŝƚƐŽĨKŶĞDŝůůŝŽŶŽůůĂƌƐ;Ψϭ͕ϬϬϬ͕ϬϬϬͿƉĞƌŽĐĐƵƌƌĞŶĐĞ <br />ĂŶĚdǁŽDŝůůŝŽŶŽůůĂƌƐ;ΨϮ͕ϬϬϬ͕ϬϬϬͿĂŐŐƌĞŐĂƚĞĚƵƌŝŶŐƚŚĞŝŶŝƚŝĂůĂŶĚĂŶLJƌĞŶĞǁĂůƚĞƌŵŽĨƚŚĞŽŶƚƌĂĐƚ͘ <br />Colliers Engineering & Design 72
The URL can be used to link to this page
Your browser does not support the video tag.