My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates Bid Document (36)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Craig A. Smith & Associates
>
Craig A. Smith & Associates Bid Document (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:01:56 PM
Creation date
8/31/2026 1:00:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />www.craigasmith.com <br /> <br />Project List Demonstrating Similar Experience <br /> <br />1. City of Sunny Isles Beach <br />Owner/Owner’s Representative: <br />Susan Simpson, Deputy City Manager <br />18070 Collins Avenue, <br />Sunny Isles Beach, FL 33160 <br />(305) 792 1800 <br />ssimpson@sibfl.net <br /> <br />• Center Island Drainage Area & Stormwater Pump Station Improvements – Engineering, Survey & <br />Utility Locates - � On-going <br /> <br />• Center Island Drainage Area & Stormwater Pump Station Improvements – Seawall Survey. <br />� On-going <br /> <br />• NE 174th Street Roadway Infrastructure Improvements – Engineering, Survey & Utility Locates. <br />� Completed <br /> <br /> <br />2. City of Sweetwater <br />Owner/Owner’s Representative: <br />Alejandro Gomez, P.E., City Engineer <br />51695 NW 110th Ave, #109 <br />Sweetwater, FL 33174 <br />(305) 485 4526 <br />agomez@cityofsweetwater.fl.gov <br /> <br />• Stormwater & Pump Station Improvements – Phase IV. � Completed <br /> <br />• Stormwater Improvements – Phase 8A (Construction Engineering Services). � Completed <br /> <br /> <br />3. Town of Golden Beach <br />Owner/Owner’s Representative: <br />Alexander Diaz, Town Manager <br />One Golden Beach Drive, <br />Golden Beach, FL 33160 <br />(305) 932-074 <br /> <br />• Center Island Stormwater Pump Station. � Completed <br /> <br />• Mean High Water Line Survey. � Completed <br /> <br />• Town Hall Improvements Boundary Survey. � Completed <br /> <br />• Site Plan/Civil Design for Wellness Center. � Completed <br /> <br />10
The URL can be used to link to this page
Your browser does not support the video tag.