My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates Bid Document (36)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Craig A. Smith & Associates
>
Craig A. Smith & Associates Bid Document (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:01:56 PM
Creation date
8/31/2026 1:00:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br />capabilities was utilized to collect data in the horizontal and vertical planes. A total of approximately 75 aerial <br />targets (control points) were set allowing for QA/QC reference and orientation to accomplish a targeted accuracy <br />of 0.1 to 0.2 feet (+/-), both horizontally and vertically. The control points were relative to the North American <br />Datum of 1983 (NAD 83) with the 2011 adjustment, horizontally, and the North American Vertical Datum of 1988 <br />(NAVD 88), vertically. Collected survey data was processed and sent to CAS CADD Department for further <br />processing through CAS Survey’s 3D software and including to the over all basemap. <br />City of Dania Beach SE 2nd Avenue and SE 7th Street Water Main Replacement – City of Dania Beach, Florida. Mr. <br />Keener Served as Principal Surveyor for the construction of the water main replacement project The scope for the <br />project included computation base sheets which encompassed computing overall site geometry for purposes of <br />providing surveying control and for determining final locations of water main improvements. Services also included <br />staking alignment at 50 foot intervals where CAS provided nail and tin tab / hub and tack at a ten (10) foot offsets <br />to the proposed water main at approximate 50-foot intervals; Staking and grading of hydrants where CAS provided <br />lath at centerline and set two graded offset laths. Services also included staking locations of valves, tees and <br />plugs and as-built record survey of water system where CAS provided drawings indicating measured data of the <br />constructed water system. All fittings, conflicts, vertical deflections, etc. were shown based on CAS field <br />measurements showing measure downs, pipe separations, and pipe cover. Mr. Keener performed quality control <br />and quality assurance for the project. <br />City of Ft. Lauderdale Water Distribution System Mapping Update– City of Ft. Lauderdale, Florida. Mr. Keener <br />Served as Principal Surveyor and oversaw the surveying and subsurface utility engineering for the water utility <br />system mapping updates delineated within the CA Smith Zone located within the City’s northeast service area. <br />The project area contained approximately 168,960 linear feet or 32 miles of existing 8” water pipelines. The scope <br />of work included 2D ground penetrating radar of the existing water mains within the prescribed right-of-way <br />corridor including identify/verifying location of existing isolation valves, air-release valves, fire hydrants, etc. and <br />approximately 12,000 associated water meters. Survey physically located the utility surface marks for existing <br />water mains provided by the CAS Utility Locates Department and above ground valves, fire hydrants, air release <br />valves, etc. relative to the defined scope. Missing and/or unknown pipes based on the GIS data supplied by the <br />client was mapped as applicable. <br />City of Lake Worth Beach, Lake Osborne Estates Water Main Replacement Project – Phase I, City of Lake Worth <br />Beach, Florida. Mr. Keener Served as Principal Surveyor for the engineering design of the Phase 1 improvements <br />which included the installation of 16,400 linear feet of new 6” to 8” PVC water main serving 228 homes in the <br />Lake Osborne Estate residential area. The new water main replaced existing asbestos cement pipe (ACP) and also <br />improved fire protection and pressures to the neighborhood residences. Work also included the abandonment of <br />existing ACP water mains and the relocation of meters and services from the rear of the residential lots to the front <br />of the lots. Two (2) 40-foot 8-inch HDPE horizontal directional drills were performed under High Ridge Road, which <br />was newly paved, to avoid pavement impacts during installation. A map of specific survey was prepared for <br />engineering design which included physically locating all above ground visible improvements and buried utilities <br />within the existing right-of-way. More than twenty (20) utility test holes were performed at pertinent locations to <br />verify buried utilities and potential conflicts. Information from Test Hole reports was incorporated into the survey <br />base maps. Rims, pipe inverts, size, and material information were shown at all drainage structures. A baseline <br />was established and cross sections taken at every 100 feet. All elevations were shown relative to the North <br />American Vertical Datum of 1988. Trees 3” or greater in diameter within the corridor were located and shown by <br />common name with caliper size at average breast height. In addition, all existing water meter locations were <br />surveyed and shown. <br />City of Ft. Lauderdale, Design-Build Force Main By-Pass Line Installation – City of Ft. Lauderdale, Florida. Mr. <br />Keener Served as Principal Surveyor and oversaw the surveying and subsurface utility engineering (SUE) within an <br />approximate 3.2-mile corridor for the design-build installation of a force main bypass line. The corridor included <br />SE 10th Ave. from SE 18th St. to SE 12th St.; SE 9th St. from SE 12th St. to SE 2nd Ct.; SE 2nd Ct. from SE 9th St to SE <br />10th St. and across the Himmarshee Canal; NE 11th Ave.; and NE 6th St. east to NE 15th St. and north to Sunrise <br />Blvd. A specific purpose survey was conducted within the right-of-way identifying all above grade utilities and <br />52
The URL can be used to link to this page
Your browser does not support the video tag.