|
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />PROFESSIONAL EXPERIENCE
<br />Mr. Unterweger is the Principal of
<br />MUEngineers. He is a Florida
<br />registered professional engineer
<br />with over twenty-six years of
<br />professional experience. His
<br />experience includes the structural
<br />design of educational facilities,
<br />municipal facilities, high-rise
<br />buildings, healthcare facilities,
<br />churches, clubhouses, building
<br />restoration, office buildings,
<br />pedestrian bridges and parking
<br />garages.
<br />Marcus Unterweger has owned
<br />and operated MUEngineers since
<br />2010, and leads a team of smart,
<br />pioneering professionals who
<br />share his vision and commitment
<br />to delivering superior results for
<br />the customers.
<br />EDUCATION
<br />Master of Engineering: Dipl. Ing.
<br />Technical University of Munich,
<br />Germany, 1999
<br />
<br />Master of Business,
<br />Business School of Edinburgh,
<br />Britain, 2004
<br />
<br />
<br />REGISTRATION
<br />Registered Engineer
<br />State of Florida
<br />Reg. No. PE 63860
<br />
<br />Registered Special
<br />Inspector/Threshold
<br />Buildings
<br />State of Florida
<br />Reg. No. 7027309
<br />
<br />
<br />PROFESSIONAL AFFILIATIONS
<br />ACI, AISC, PTI, ASCE and FSEA
<br />
<br />
<br />
<br />Marcus Unterweger, P.E., S.I., LEED AP
<br />Principal
<br />RELEVANT PROJECT EXPERIENCE
<br />Fort Lauderdale Aquatic Center, Fort Lauderdale, Florida-Principal in Charge. This project involves the
<br />complete structural design of a new sea wall, approximately 1,407 feet long, to replace the existing
<br />sea wall at the Fort Lauderdale Aquatic Center.
<br />Seawall Assessment and Restoration, Aventura, Florida-Principal-in-Charge. MUE was involved in the
<br />restoration of two sections of seawalls located along canals (2.1 miles) for the City of Aventura. During
<br />the visual observations, structural assessment of the current conditions of the existing piles, seawall
<br />panels and seawall caps were obtained, analyzed and written report of our findings were prepared.
<br />Torry Island Seawall & Walkway, Belle Glade, Florida - Principal in Charge – MUE’s role on this project was
<br />to structurally design a new 800ft long new bulkhead/seawall structure and concrete boardwalk structure.
<br />Additionally, MUE engineered foundations and anchor points to secure floating dock structures designed by
<br />another company.
<br />Port Everglades Consolidated Maintenance Facility Building, Hollywood, FL-Principal-in-Charge. MUE
<br />provided comprehensive schematic design plans relating to the consolidation of all port maintenance
<br />functions, including a gas station and vehicle maintenance facility. The project is now in Phase II aiming
<br />for a final set of construction documents for September 2025.
<br />Water Wastewater Plant-Wind Hardening, Coral Springs, Florida-Principle-in-Charge. MUE is a member of
<br />the team for the assessment of the structural adequacy of six existing building structures and providing
<br />structural hardening details to ensure compliance with the current FBC standards at the water-
<br />wastewater treatment plant for the City of Coral Springs.
<br />Clewiston Police Department, Clewiston, Florida- Principal in Charge. Our involvement in this project is
<br />centered around renovations to convert an existing structure into a police station. Our services included:
<br />steel framing for a roll up door, new interior CMU walls and partition walls, new exterior door openings,
<br />and new ADA ramp including foundations, walls, and slab on grade.
<br />Egret Pump Station Remodel, Hallandale Beach, Floria-Principal in Charge. Structural design related to
<br />three openings in the existing roof slab and RC floor slab below the roof to allow installation of
<br />submersible pumps and other modifications and upgrades to the pump station. Including emergency
<br />generator, 16.5ft deep muffin monster manhole installation design and foundation slabs.
<br />Pelmad Industrial Park-Pump Station Improvements, Medley, Florida-Principal in Charge. MUE provided
<br />structural design and engineering related to the rehabilitation of an existing pump station structure.
<br />Services include control panel foundation slab, generator foundation slab, valve vault enclosure and
<br />structural restoration related to the wet well.
<br />CW Thomas Community Center, Dania Beach, Florida- Principal-in-Charge -A member of the team for
<br />this pursuit involving the structural design of a new 14,600sf community and aquatics center including an
<br />indoor basketball court, gymnasium, classrooms, offices, locker rooms and kitchen area.
<br />Pioneer Park Boat Ramps, Boynton Beach, Florida-Principal in Charge. MUE structurally designed a new
<br />75ft long boat ramp structure with a floating dock.
<br />
<br />• 26+ years in professional practice
<br />
<br />• Previous working experience with most type of building structures including high rise residential
<br />buildings, hotels, restaurants, water and waste water treatment facilities, city and county
<br />recreational parks, office buildings, industrial buildings, car dealerships, townhouses, sing family
<br />residential structures, exclusive luxury residential mansions, port terminals, seawalls, boat ramps,
<br />seawalls, levees, warehouses, lift stations, pedestrian bridges, docks, boardwalks, residential
<br />construction waterside of the coastal construction line, schools, gymnasiums, auditoriums,
<br />religious facilities, parking garages, historic structures, restoration of existing concrete and steel
<br />structures, vehicular bridges, alterations and additions to existing cruise ships to support new
<br />antennas and basketball enclosures, airport terminals, baggage handling system replacements,
<br />sport facilities, etc.
<br />• Project Role: Mr. Unterweger will be the principal in charge overseeing the project contract related
<br />matters
<br />• LEED Certified
<br />72
|