Laserfiche WebLink
www.MUEngineers.com <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PROFESSIONAL EXPERIENCE <br />Mr. Madriz is the V.P. of <br />Engineering for MUE and brings <br />more than twenty years of <br />structural engineering practice <br />and skill to the table. He is <br />incredibly knowledgeable in <br />building structures and analysis, <br />the latest software, and current <br />building codes and industry <br />standards. <br />Ricardo Madriz has experience in <br />the structural design of <br />educational facilities, municipal <br />facilities, high-rise buildings, <br />building restoration, residential <br />buildings, water related <br />structures, office buildings and <br />parking garages. <br />EDUCATION <br />Master of Engineering: <br />McGill University, 2004 <br /> <br />Bachelor of Civil Engineering <br />McGill University, 2002 <br />REGISTRATION <br />Registered Engineer <br />State of Florida <br />Reg. No. PE 68444 <br /> <br /> <br /> <br /> <br /> <br />Ricardo Madriz, P.E., LEED AP <br />Vice President /Sr. Project Manager <br /> <br />RELEVANT PROJECT EXPERIENCE <br />Coral Springs Westside Maintenance Facility, Coral Springs, FL- Project Manager. Our office is a member <br />of the team for this RFQ as a sub-consultant. The project involved an interior and exterior remodel of a <br />maintenance facility, including the reinforcement of building components to meet the latest FBC <br />standards. Additionally, the scope included the addition of new interior mezzanine levels for offices , <br />installation of new stairs and elevators and the construction of exterior steel canopies and generator <br />foundations to modernize the facility, improve functionality and ensure compliance. <br />Federal Reserve Bank, Cafeteria Kitchen and Servery Remodel, Miami, Florida-Project Manager. Our role <br />for this project was to provide structural engineering and design related to the remodel and updates to <br />the cafeteria, dining room and kitchen areas. The structural scope encompasses several key elements, <br />including the closure of the existing roof openings, a thorough analysis of the existing roof structure to <br />accommodate new rooftop units, and the selective removal and replacement of the slab on grade as <br />necessitated by the installation of new plumbing systems. <br />Wastewater Storm Pump Station, Coconut Creek, Florida-Project Manager. MUE provided structural <br />design and engineering of the concrete structure of a new storm water pump station for Broward <br />County. <br />Water Treatment Plant, Boca Raton, Florida-Project Manager-MUE provided structural design and <br />engineering related to a new one-story compliance building as well as modifications and restoration of <br />the lift pump station and enclosures for the City of Boca Raton. <br />Consulting Services for Port Everglades, Hollywood, FL-Sr. Project Manager. Member of the team for the <br />continuing services for civil engineering related to Port Everglades. Our current scope of work includes <br />assessments, upgrades, and modifications to the Port Seacor building. <br />Coral Springs Fire Station #95, Coral Springs, Florida - Project Manager – Our involvement on this project <br />was to participate in the structural design of a new ~11,000 sf one-story fire station. MUEngineers, Inc. <br />was a member of the team for the City of Coral Springs RFP, as a sub-consultant. <br />The Lord’s Place, West Palm Beach, Florida-Project Manager. Structural design of a new outreach facility <br />in West Palm Beach. The two-story, 25,000sf structure consists of a cafeteria, kitchen, outdoor open <br />garden, private office spaces, meeting rooms, conference room and operational facilities. <br />Secret Woods Park, Fort Lauderdale, Florida-Project Manager. MUEngineers, Inc. was involved in the <br />structural design of an elevated wood walkway, deck, and two-story observation platform. MUE <br />provided details of precast concrete piles, aluminum C-section girders bolted to the precast concrete <br />piles, and wood truss tie-downs. <br />Pompano Beach Water Treatment Plant, Pompano Beach, Florida – Project Manager - MUEngineers, Inc. <br />structurally designed modifications made to the exterior building and window replacement. <br /> <br /> <br /> <br /> <br /> <br /> <br />• 20+ years in professional practice <br /> <br />• Experience with most type of building structures including hotels, restaurants, water and waste water <br />treatment facilities, city and county recreational parks, office buildings, industrial buildings, car <br />dealerships, townhouses, sing family residential structures, exclusive luxury residential mansions, port <br />terminals, warehouses, lift stations, pedestrian bridges, boardwalks, residential construction waterside <br />of the coastal construction line, schools, gymnasiums, auditoriums, religious facilities, parking <br />garages, historic structures, restoration of existing concrete and steel structures, airport terminals, <br />baggage handling system replacements, sport facilities, etc. <br />• Project Role: Mr. Madriz will oversee the daily project management, ensuring timelines are met, <br />project is moving forward, reviewing project engineers work and answering and solving questions, <br />communicating with the entire design team and final overall structural drawings. <br />• LEED Certified <br />73