|
www.MUEngineers.com 3440 NE 12th Avenue
<br />Oakland Park, FL 33334
<br />
<br />
<br />
<br />
<br />
<br />
<br />PROFESSIONAL EXPERIENCE
<br />Mr. Rangoonwala is currently a
<br />Vice President at MUE. He is a
<br />licensed Florida P.E. and has over
<br />thirteen years of professional
<br />experience. His experience
<br />includes the structural design of
<br />manufacturing facilities,
<br />Residential and Commercial
<br />buildings, hotels, recreational
<br />facilities, high-rise buildings,
<br />residential houses, office buildings,
<br />and parking garages.
<br />Yusuf also has over two and a half
<br />years of work experience in India as
<br />a Structural Engineer. Mr.
<br />Rangoonwala also has previous
<br />work experience in the
<br />petrochemical and oil and gas
<br />refineries industries.
<br />EDUCATION
<br />Master of Science: Structural
<br />Engineering
<br />Virginia Tech,
<br />Virginia, USA, 2016
<br />
<br />Bachelor of Engineering: Civil
<br />Engineering
<br />University of Mumbai,
<br />India, 2012
<br />
<br />
<br />REGISTRATION
<br />Registered Engineer
<br />State of Florida
<br />Reg. No. PE 90777
<br />
<br />PROFESSIONAL AFFILIATIONS
<br />American Society of Civil Engineers
<br />
<br />American Institute of Steel
<br />Construction
<br />
<br />American Concrete Institute
<br />
<br />
<br />Yusuf Rangoonwala, P.E.
<br />Vice President/Assistant Sr. Project Manager
<br /> RELEVANT PROJECT EXPERIENCE
<br />CW Thomas Community Center, Dania Beach, Florida-Project Manager-A member of the team for this
<br />pursuit involving the structural design of a new 14,600sf community and aquatics center including an
<br />indoor basketball court, gymnasium, classrooms, offices, locker rooms and kitchen area.
<br />Jazwares Shotgun Road, Sunrise, Florida- Project Engineer - My role was to provide Structural
<br />engineering and design related to the remodel and additions to the existing building structure. Our
<br />services included determining the load carrying capacity of the existing mezzanine floor framing and
<br />providing design to strengthen the existing wood mezzanine floor framing and its connection to the
<br />main building structure for the mezzanine floor to be utilized as office space for meeting rooms.
<br />Retail Potable Water and Wastewater Master Plan RFQ, Various Broward County, FL-Project Manager.
<br />MUE is the structural engineering consultant for this master plan contract. Thus far, we have provided
<br />structural observations and assessments for twenty existing wastewater pumping stations and six water
<br />repump stations located throughout Broward County. MUE provided a structural condition rating, a
<br />description of our findings and assessment for each station observed.
<br />Torry Island Seawall & Walkway, Belle Glade, Florida – Project Engineer – MUE’s role on this project was
<br />to structurally design a new 800ft long new bulkhead/seawall structure and concrete boardwalk structure.
<br />Additionally, MUE engineered foundations and anchor points to secure floating dock structures designed
<br />by another company.
<br />Pelmad Industrial Park-Pump Station Improvements, Medley, Florida-Project Manager. MUE provided
<br />structural design and engineering related to the rehabilitation of an existing pump station structure.
<br />Services include control panel foundation slab, generator foundation slab, valve vault enclosure and
<br />structural restoration related to the wet well.
<br />Consulting Services for Port Everglades, Hollywood, FL-Project Engineer. A member of the team for the
<br />continuing services for civil engineering related to Port Everglades. Our current scope of work includes
<br />assessments, upgrades, and modifications to the Port Seacor building.
<br />I&B Medical Offices, Pompano Beach, Florida-Project Manager. This project involves the structural
<br />design of two separate 1-story buildings in Pompano Beach, Florida, with a combined gross area of
<br />16,536 square feet. One building is designed to serve as a senior center and medical office, while the
<br />other is constructed as a shell building for future use. Both buildings utilize tilt-wall panels and hollow
<br />core plank framing, ensuring cost-effective, durable construction with flexibility for future adaptations.
<br />Wellington Sports Complex, Wellington, Florida-Project Manager. Our role for this ongoing project is
<br />structural design and engineering for a new 90,000sf, one-story community sport complex building and
<br />a detached and structurally independent 6,000sf enclosed batting cage building. The sports complex
<br />gymnasium facility includes fitness area, indoor courts, locker rooms, gym, offices, commercial kitchen
<br />& small café and tenant buildouts for chiropractor and physical therapy.
<br />Sawgrass to Seagrass Center, Deerfield Beach, Florida-Project Manager. MUE is a member of the team
<br />for the structural design of a new 17,000sf public facility center in Deerfield Beach. The ground floor
<br />features an open parking garage and office spaces, while the second floor includes open terrace
<br />areas, a new community center and an exhibition space. MUE will provide structural special inspections
<br />during the construction phase.
<br />
<br />
<br />
<br />• 13+ years in professional practice.
<br />• Previous working experience with most type of building structures including high rise residential
<br />buildings, hotels, restaurants, water and waste water treatment facilities, city and county
<br />recreational parks, office buildings, industrial buildings, car dealerships, townhouses, sing family
<br />residential structures, exclusive luxury residential mansions, warehouses, lift stations, pedestrian
<br />bridges, docks, boardwalks, residential construction waterside of the coastal construction line,
<br />religious facilities, parking garages, vehicular bridges, sport facilities, etc.
<br />• Project Role: Mr. Rangoonwala will be assisting Mr. Ricardo Madriz on an as / if needed basis
<br />managing the design efforts and the project team resource assignments.
<br />74
|