My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Bid Document (14)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Cummins Cederberg
>
Cummins Cederberg Bid Document (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:04:38 PM
Creation date
8/31/2026 1:03:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br />• Marine engineering <br />• Seawall rehabilitation <br />• Above and below water <br />inspection <br />• Regulatory permitting <br />Contact Information: <br />Coastal Towers Condominium <br />Association <br />William Vega <br />400 Kings Point Drive <br />Sunny Isles Beach, FL 33160 <br />305-945-6326 <br />Cummins Cederberg was engaged to assess and rehabilitate an existing seawall <br />for a waterfront condominium at the Intracoastal Waterway. A portion of the <br />seawall was stabilizing the entrance road but had severely deteriorated, which <br />could affect access to the property. <br />Cummins Cederberg conducted an in-water inspection of the seawall to determine <br />the level of deterioration along with short- and long-term rehabilitation strategies. <br />As construction cost was a concern, the most severe and important areas were <br />determined for full replacement while interim repairs were conducted in other <br />areas to prolong service life. A combined repair and replacement project were <br />designed and permitted. Cummins Cederberg processed and obtained all the <br />required environmental permits from Miami-Dade County DERM, FDEP, and <br />USACE. This is also included extensive discussions with the agencies relative to <br />submerged land ownership due to complex historical land ownership issues. <br />As part of construction administration services, Cummins Cederberg <br />interviewed and obtained bids from qualified marine contractors and provided <br />recommendations for the Condominium Association. <br />Cummins Cederberg served as special inspector and monitored construction with <br />field reports for documentation and for the Condominium Association to follow <br />progress. The project was completed on time and budget. The total construction <br />cost was within 5% of the construction cost estimated by Cummins Cederberg as <br />part of the initial inspection. <br />Coastal Towers Seawall and Dock <br />Sunny Isles Beach, Florida
The URL can be used to link to this page
Your browser does not support the video tag.