My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Bid Document (14)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Cummins Cederberg
>
Cummins Cederberg Bid Document (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:04:38 PM
Creation date
8/31/2026 1:03:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br />• Coastal engineering <br />• Seawall design <br />• Grant support <br />• Living shoreline <br />engineering design <br />• Living shoreline permitting <br />• Benthic surveys <br />• Fishing pier design <br />• Kayak launch design <br />Contact Information: <br />City of Miami Beach <br />Bryan Sevilla, <br />1700 Convention Center Dr. <br />Miami Beach, FL 33139 <br />305-673-7080 ext. 26745 <br />Cummins Cederberg is providing coastal engineering and environmental consulting <br />services to the City of Miami Beach to improve West 40th Street’s seawall and <br />living shoreline to increase the elevation of the shoreline, provide environmental <br />benefits, increase resiliency of waterfront City property, and increase community <br />engagement with the water. <br />Our team of marine biologists conducted an environmental resource survey at the <br />site to identify and assess potential seagrasses, corals, or other marine resources <br />of significance. <br />Following the environmental resource survey, our engineers developed a design <br />for the replacement of 256 LF section of seawall with the implementation of a <br />living shoreline to protect the uplands against tidal flooding, enhance stabilization, <br />add environmental value, and bolster waterfront resiliency. Two fishing piers and <br />a floating kayak launch will be installed as well as ecological enhancement will be <br />achieved through the installation of mangrove planters. <br />As the project is funded by a Resilient Florida Grant, Cummins Cederberg is also <br />supporting the City with the completion of a SLIP study for the living shoreline. <br />West 40th Street Seawall Replacement <br />and Living Shoreline <br />Miami Beach, Florida <br />Existing condition
The URL can be used to link to this page
Your browser does not support the video tag.