My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Bid Document (14)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Cummins Cederberg
>
Cummins Cederberg Bid Document (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:04:38 PM
Creation date
8/31/2026 1:03:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br />• Coastal engineering <br />• Seawall design <br />• Grant support <br />• Living shoreline <br />engineering design <br />• Living shoreline permitting <br />• Benthic surveys <br />• Boardwalk design <br />• Pier design <br />Contact Information: <br />City of Miami Beach <br />Bryan Sevilla <br />1700 Convention Center Dr. <br />Miami Beach, FL 33139 <br />305-673-7080 ext. 26745 <br />Cummins Cederberg is providing coastal engineering and environmental consulting <br />services to the City of Miami Beach to improve Beach View Park’s seawall and <br />living shoreline to increase the elevation of the shoreline, provide environmental <br />benefits, increase resiliency of waterfront City property, and increase community <br />engagement with the water. <br />Our team of marine biologists conducted an environmental resource survey <br />at the site to identify and assess potential seagrasses, corals, or other marine <br />resources of significance. Subsequently, our engineers developed a design for <br />the replacement of 300 LF section of seawall with the implementation of a living <br />shoreline. The design aimed to safeguard upland areas against tidal flooding, <br />enhance shoreline stabilization, add environmental features, and bolster <br />waterfront resiliency. <br />The proposed living shoreline solution included the installation of specialized <br />planters incorporating red and black mangroves along with coastal marsh grasses <br />that will enhance the entire project area, enclosed by a riprap revetment and a <br />sheet pile toe wall. The design also includes enhancement of the area immediately <br />landward of the living shoreline with the addition of coastal hammock upland <br />trees and the widening of the existing sidewalk to provide better pedestrian <br />circulation. The design features a perimeter boardwalk with ADA access walkways <br />to the boardwalk and a central fishing pier as an additional amenity to connect <br />residents with the living shorelines and the water. <br />As the project is funded by a Resilient Florida Grant, Cummins Cederberg is also <br />supporting the City with the completion of a SLIP study for the living shoreline. <br />Beach View Park Seawall Replacement <br />and Living Shoreline <br />Miami Beach, Florida <br />Existing condition
The URL can be used to link to this page
Your browser does not support the video tag.