Laserfiche WebLink
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />65 <br />GINA CHIELLO, WEDG <br />Associate Principal, Sr. Environmental Permitting <br />Miami Shores Bayfront Park, Miami Shores, Florida. Responsible for providing oversight for field investigations and <br />permitting with DERM, FDEP and USACE for replacement of 880 LF of bulkhead at a public park. DERM, FDEP, and <br />USACE permitting is underway. <br />FDOT D6 Seven Mile Bridge, Marathon, Florida. Project manager and field lead for a qualitative benthic survey <br />as part of the Seven Mile Bridge FDOT D6 PD&E study. The survey involved conducting a series of bounce dives <br />within two proposed bridge reconstruction alignments. Pre-survey analysis included remote sensing characterization <br />using satellite-derived seafloor classification to select ground-truth sites. Post-survey analysis involved modifications <br />to the seafloor classification. An Environmental Survey Report was prepared. Currently under contract to conduct a <br />quantitative survey to assess impacts. <br />Sawfish Bay Park Shoreline Improvements, Jupiter, Florida. Responsible for permitting and marine resource surveying <br />for a multi-phased project to environmentally restore a historic marina basin and protect the shoreline of a municipal <br />park. The project includes caping sand for seagrass recruitment, living shoreline, rock revetment, and reef ball units in <br />configurations that will accomplish the Town of Jupiter’s goals of increasing coastal resiliency and enhancing natural <br />habitat, while minimizing design and permitting costs. USACE and FDEP permits secured for Phases 1 and 2. <br />Bentley Bay Marina Permitting, Miami Beach, Florida. Project manager responsible for marine resource surveying and <br />environmental permitting involving extensive project team and agency coordination relative to sovereign submerged <br />lands use, consistency with the Miami-Dade County Manatee Protection Plan, and avoidance and minimization <br />of impacts to marine resources. Performed three marine resource surveys to document the marine resources of <br />significance following the NMFS protocol for surveying Johnson’s Seagrass and Acropora spp. Extensive sovereign <br />submerged lands research required relative to historical mooring and Butler Act Disclaimer to secure sovereign <br />submerged lands authorization via a new lease in the BBAP. Environmental permits were secured from the USACE, <br />FDEP, and DERM. Continued environmental and engineering support. <br />Currie Park Redevelopment, City of West Palm Beach, Florida. Currie Park is a 16-acre public waterfront park. The city <br />is preparing an adaptive redesign of the park to mitigate flooding from rainfall, king tides, and sea level rise. Project <br />manager responsible for the coastal components (e.g. rock revetment, living shoreline, boat ramp improvements, kayak <br />launches, new over water piers and boardwalks, and “social” steps down to the water) of the project’s master plan <br />including but not limited to permitting feasibility, concept planning, marina implementation strategy, public outreach <br />interpretation and grant funding options master plan completed 2021. Currently, project manager responsible for <br />fieldwork, engineering, permitting, and grant management to implement the master plan. State permits secured and <br />federal permit underway. Additionally, assisted with securing a DEO grant which was awarded to the project in the <br />amount of $16M. <br />City of West Palm Beach Pilot Seawall Elevation Project, West Palm Beach, Florida. The Pilot Project includes <br />replacement of ~ 1,700 LF of seawall at a higher elevation and adding living shoreline components to support the <br />City’s efforts to provide additional protection to upland infrastructure to reduce flooding from sea level rise, storm surge, <br />and wave overtopping. As co-project manager and senior environmental oversight responsible for public outreach, <br />environmental feasibility, concept design, marine resource surveying, and environmental permitting. <br />Baker’s Haulover Inlet Benthic Mapping and EFH Assessment, Haulover Inlet, Florida. The USACE is proposing to <br />dredge the Baker’s Haulover Inlet ebb shoal and place the material on the Town of Bal Harbor shoreline. Marine biologist <br />for large-scale habitat mapping and characterization study of seagrass, macroalgae and hardbottom communities to <br />support permitting and NEPA efforts, as well as future monitoring design. Also provided ESA Section 7 consultation <br />support and Essential Fish Habitat Assessment. <br />Matheson Hammock Boardwalk Permitting, Miami-Dade County, Florida. This project involves the construction of <br />a new boardwalk along a mangrove trail within Matheson Hammock Park involving mangrove trimming and some <br />wetland impacts. Performed a wetland delineation, design development, permitting, and mitigation planning and <br />calculations for the newly proposed boardwalk. Coordination with USACE, FDEP, DERM, NFC and EEL is underway.