Laserfiche WebLink
RFQ #26-07-01 | 92 <br /> <br />Alexis Morgado <br />DESIGNER <br /> <br />Summary <br />Mr. Morgado’s experience to date has been varied and extensive. Alexis is familiar with the <br />production of design plans as well as the design required. He has experience with Microstation, <br />AutoCADD and Open Roads Designer (ORD). <br />NE 79th St Bridge Replacement. <br />CLIENT FDOT District 6 | ROLE CADD Technician <br />CADD Technician for this Bridge replacement project along SR 934 / NE 79th Street Causeway <br />in North Bay Village. Project improvements include the replacement of four existing bridges with <br />two new bridges that are elevated to enhance resilience against sea level rise and incorporating <br />additional protection measures. The project also includes roadway widening, as well as <br />implementation of bicycle lanes, new sidewalk, curb-ramp and curb and gutter reconstruction, <br />drainage improvements, ADA upgrades, signalization and lighting improvements, signing and <br />marking upgrades, utility adjustments, subsurface utility engineering services, hydraulic <br />modeling, and environmental and drainage permitting. <br />North Bay Village Sidewalk and ADA Improvements Ph.3 <br />CLIENT North Bay Village | ROLE CADD Technician <br />CADD Technician responsible for this sidewalk and ADA improvements project at Harbor Island, <br />Treasure Island, and John F. Kennedy (JFK) Causeway. This federally funded LAP project fell <br />under the authority of FDOT and North Bay Village and was constructed in compliance with <br />FDOT specifications in addition to federal LAP requirements. Improvement components <br />included new sidewalk and pedestrian ramps at Harbor Island, repairing existing sidewalk at <br />Treasure Island and JFK Cswy., signing and pavement marking upgrades, and landscaping. <br />Port Miami Terminal G <br />CLIENT PortMiami | ROLE CADD Technician <br />EAC Consulting, Inc. (EAC) provided comprehensive civil engineering services for the <br />PortMiami Design-Build project, which encompassed the new Cruise Terminal G and Parking <br />Garage Complex to support Royal Caribbean International and Celebrity Cruises. The scope <br />included site civil design—covering demolition, grading, drainage, ADA compliance, SWPPP <br />plans, and coordination with environmental and utility consultants—as well as roadway <br />engineering for reconfiguration, new alignments, drainage systems, signage, lighting, and <br />maintenance of traffic plans. Additional services included bridge structure design, ITS lighting <br />plans, and LEED Gold certification support. EAC delivered phased construction documents at <br />30%, 60%, 90%, and 100%, managed permitting and regulatory approvals, and provided <br />construction-phase services such as shop drawing reviews, RFIs, inspections, and record <br />drawings. <br />City of Weston Indian Trace from Saddle Club Rd. to SW 160th Ave. <br />CLIENT City of Weston | ROLE CADD Technician <br />CADD Technician for this milling and resurfacing and widening project in the City of Weston. <br /> <br />3 Years of Experience <br />Education <br />BS Chemical Engineering - <br />Camilo Cienfuegos University of <br />Matanzas <br />Substitute Training - Miami <br />Dade College <br />Skills <br />FDOT CADD <br />Microstation SS10 <br />OpenRoads Connect Edition