25 <br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C <br />Predictive Step Purpose ECF Activities RFQ #26-07-01 Application Result for the City <br />1. Baseline Existing <br />Conditions <br />Establish the true starting <br />point before scope, <br />schedule, or fee are <br />finalized. <br />Review record drawings, inspect <br />equipment, document ratings and <br />age, verify service configuration, <br />photograph deficiencies, note flood <br />and corrosion exposure, and <br />interview maintenance staff. <br />Supports task orders for City <br />facilities, lighting, EV <br />charging, solar, pump <br />stations, security power, <br />utility relocations, and <br />emergency systems. <br />A reliable scope based on <br />observed conditions <br />rather than assumptions. <br />2. Identify Risk <br />Drivers <br />Determine which <br />conditions are most likely <br />to affect safety, <br />reliability, cost, <br />permitting, or schedule. <br />Screen for overloaded equipment, <br />obsolete components, code <br />deficiencies, corrosion, poor access, <br />inadequate clearances, utility <br />constraints, outage risk, and <br />maintainability concerns. <br />Aligns with continuing- <br />services assignments where <br />the City needs quick technical <br />judgment before authorizing <br />design or construction <br />documents. <br />Early warning of risks that <br />could become change <br />orders, delays, or service <br />interruptions. <br />3. Forecast <br />Dependencies <br />Identify decisions or <br />third-party actions that <br />can control the critical <br />path. <br />Track FPL coordination, agency <br />reviews, permit requirements, <br />easements, long-lead equipment, <br />outage windows, procurement <br />timing, and interdisciplinary inputs. <br />Particularly important for <br />transformer relocations, <br />undergrounding, solar <br />interconnections, EV charging <br />loads, generator work, and <br />work in occupied public <br />facilities. <br />A realistic milestone <br />schedule with known <br />dependencies visible <br />before authorization. <br />4. Prioritize <br />Corrective Actions <br />Rank improvements by <br />urgency, funding <br />practicality, operational <br />need, and compliance <br />impact. <br />Separate immediate safety/code <br />items, reliability corrections, <br />maintenance-driven repairs, capital <br />replacements, and optional <br />enhancements. Identify logical <br />phasing and temporary measures. <br />Helps the City issue <br />manageable, CCNA-compliant <br />task orders and defer <br />noncritical items without <br />losing sight of future needs. <br />A practical action plan <br />that supports budget <br />decisions and minimizes <br />disruption. <br />5.Convert Findings <br />to Deliverables <br />Turn technical findings <br />into the right <br />professional-service <br />product for the task. <br />Prepare memoranda, assessment <br />reports, design criteria, scope <br />narratives, calculations, drawings, <br />specifications, estimates, <br />coordination logs, and QA/QC <br />review checklists. <br />Scales to small studies, <br />focused permit responses, <br />design packages, bid <br />documents, construction <br />support, and capital-planning <br />recommendations. <br />Clear, buildable <br />deliverables tied to the <br />City’s authorized scope <br />and decision needs. <br />6. Measure, Close, <br />and Inform Future <br />Work <br />Use each task order to <br />improve the City’s <br />information base for <br />future assignments. <br />Document completed work, <br />unresolved conditions, record- <br />document updates, warranty <br />needs, remaining deficiencies, <br />recommended next steps, and <br />lessons learned for related facilities <br />or systems. <br />Creates continuity across <br />recurring continuing-services <br />assignments rather than <br />treating each request as <br />isolated. <br />Better institutional <br />knowledge, cleaner <br />closeout, and faster <br />future scoping.