My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECF Engineering Consultants Bid Document (27)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
ECF Engineering Consultants
>
ECF Engineering Consultants Bid Document (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:08:52 PM
Creation date
8/31/2026 1:08:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C <br />transformer relocations, new services, undergrounding, solar interconnections, planned outages, <br />specialty equipment, and permit reviews. <br />•Establish milestone dates and the City’s review periods at the start of the task. <br />•Identify long-lead utility, equipment, permitting, and procurement items during preliminary design. <br />•Use short-interval look-ahead planning during compressed assignments and construction support. <br />•Issue meeting notes and action items with responsible parties and required dates. <br />•Escalate unresolved decisions before they affect the critical path. <br />•Coordinate outage windows and temporary-power requirements with facility operations before bidding. <br />•Revise the schedule when the authorized scope changes and document the effect on downstream <br />milestones. <br />4.5 Quality Assurance and Quality Control <br />Quality control is built into production; quality assurance is an independent check before formal <br />submission. The design engineer is responsible for the accuracy and coordination of the work as it is <br />developed. A qualified reviewer who is not responsible for day-to-day production will review the <br />milestone package before it is issued to the City. <br />QA/QC Review Area Minimum Review <br />Existing Conditions Record-document consistency; equipment ratings; service configuration; panel and feeder <br />identification; field photographs; deficiencies; site access; flood and corrosion exposure. <br />Calculations <br />Load calculations; voltage drop; short-circuit data; equipment ratings; grounding; generator and <br />transfer-switch sizing; lighting and photometrics; energy-code requirements; applicable <br />coordination studies. <br />Drawings One-line diagrams; plans; circuiting; panel schedules; details; equipment clearances; notes; <br />demolition; phasing; temporary power; utility point of connection; interdisciplinary coordination. <br />Specifications Consistency with drawings; approved products; coastal materials and coatings; testing; <br />commissioning; submittals; closeout; warranties; outage and sequencing requirements. <br />Cost and Schedule Quantity consistency; equipment scope; allowances; alternates; escalation; constructability; long- <br />lead items; utility and permit dependencies. <br />Permit and Bid Readiness Applicable code editions; City and Miami-Dade requirements; FPL criteria; signed-and-sealed <br />requirements; permit forms; bid forms; coordination of addenda and responses. <br />Formal submissions will not be released until comments from the independent review are resolved or <br />specifically accepted by the Project Manager and Engineer of Record. ECF will maintain review records in <br />the project file.
The URL can be used to link to this page
Your browser does not support the video tag.