Laserfiche WebLink
30 <br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C <br />transformer relocations, new services, undergrounding, solar interconnections, planned outages, <br />specialty equipment, and permit reviews. <br />•Establish milestone dates and the City’s review periods at the start of the task. <br />•Identify long-lead utility, equipment, permitting, and procurement items during preliminary design. <br />•Use short-interval look-ahead planning during compressed assignments and construction support. <br />•Issue meeting notes and action items with responsible parties and required dates. <br />•Escalate unresolved decisions before they affect the critical path. <br />•Coordinate outage windows and temporary-power requirements with facility operations before bidding. <br />•Revise the schedule when the authorized scope changes and document the effect on downstream <br />milestones. <br />4.5 Quality Assurance and Quality Control <br />Quality control is built into production; quality assurance is an independent check before formal <br />submission. The design engineer is responsible for the accuracy and coordination of the work as it is <br />developed. A qualified reviewer who is not responsible for day-to-day production will review the <br />milestone package before it is issued to the City. <br />QA/QC Review Area Minimum Review <br />Existing Conditions Record-document consistency; equipment ratings; service configuration; panel and feeder <br />identification; field photographs; deficiencies; site access; flood and corrosion exposure. <br />Calculations <br />Load calculations; voltage drop; short-circuit data; equipment ratings; grounding; generator and <br />transfer-switch sizing; lighting and photometrics; energy-code requirements; applicable <br />coordination studies. <br />Drawings One-line diagrams; plans; circuiting; panel schedules; details; equipment clearances; notes; <br />demolition; phasing; temporary power; utility point of connection; interdisciplinary coordination. <br />Specifications Consistency with drawings; approved products; coastal materials and coatings; testing; <br />commissioning; submittals; closeout; warranties; outage and sequencing requirements. <br />Cost and Schedule Quantity consistency; equipment scope; allowances; alternates; escalation; constructability; long- <br />lead items; utility and permit dependencies. <br />Permit and Bid Readiness Applicable code editions; City and Miami-Dade requirements; FPL criteria; signed-and-sealed <br />requirements; permit forms; bid forms; coordination of addenda and responses. <br />Formal submissions will not be released until comments from the independent review are resolved or <br />specifically accepted by the Project Manager and Engineer of Record. ECF will maintain review records in <br />the project file.