Laserfiche WebLink
<br /> <br /> <br /> <br />31 <br /> <br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C <br />4.6 City-Specific Technical Controls <br />Sunny Isles Beach Condition ECF Design Control <br />Salt-Air and Corrosion <br />Select enclosures, raceways, fixtures, disconnects, fasteners, supports, coatings, gasketing, <br />and penetrations for the actual exposure. Use NEMA-rated and corrosion-resistant materials <br />where warranted and provide details that prevent water retention and galvanic <br />incompatibility. <br />Hurricane, Flood, and Surge Coordinate wind anchorage, flood exposure, equipment elevation, lightning protection <br />interfaces, surge protective devices, grounding, access after storms, and restoration <br />priorities. <br />Occupied Facilities and High-Rise <br />Context <br />Plan outages, noise, access, temporary power, egress, resident or public notifications, and <br />phased installation. Avoid designs that require broad shutdowns when selective work is <br />feasible. <br />FPL and Utility Coordination Confirm service voltage, available capacity, metering, transformer requirements, easements, <br />service point, fault-current data, undergrounding constraints, renewable interconnection, <br />and outage scheduling early. <br />Public Lighting Use photometric analysis, uniformity, glare control, maintenance access, fixture availability, <br />pole placement, energy use, controls, and coordination with trees, utilities, drainage, traffic, <br />and pedestrian routes. <br />Emergency and Critical Power Establish critical-load priorities with City operations, verify generator and transfer capacity, <br />evaluate fuel and runtime requirements in coordination with other disciplines, and define <br />testing and commissioning. <br /> <br />4.7 Communication, Issue Resolution, and Complaints <br />The Project Manager will be the City’s single point of accountability. Technical staff may coordinate <br />directly with City personnel when efficient, but commitments affecting scope, fee, schedule, or design <br />direction will be documented through the Project Manager. ECF will maintain a concise action and <br />decision log for active assignments. <br />• Routine questions will be acknowledged promptly and answered by the person responsible for the work. <br />• Issues affecting public safety, facility operation, schedule, cost, permitting, or utility service will be <br />brought to the City Project Manager immediately. <br />• A complaint will be acknowledged the same business day when received during normal business hours. <br />The Project Manager will investigate, identify the responsible action, and provide the City with a <br />response or recovery plan. <br />• Unresolved matters will be escalated to the Principal-in-Charge without forcing City staff to repeat the <br />history of the issue. <br />• Meeting notes will identify decisions, action owners, and due dates. ECF will not rely on informal verbal <br />direction for changes that affect the authorized task order. <br /> <br />4.8 Construction-Phase Management <br />Construction administration will be scaled to the task order but will remain disciplined. ECF will review <br />contractor submittals and RFIs against the contract documents, observe work at appropriate stages, <br />document deviations, evaluate proposed changes, and assist the City in distinguishing a legitimate <br />concealed condition from contractor means and methods or incomplete work. Planned outages,