Laserfiche WebLink
<br /> <br /> <br /> <br />9 <br /> <br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C <br />2.4 Insurance, Litigation, and Contract Disclosures <br />Disclosure ECF Response <br />Proof of Insurance See Appendices for Certificate of Insurance <br />Outstanding Litigation Threatening <br />Performance None <br />Criminal or Civil Litigation During Prior Five <br />Years None <br />Debarment or Termination for Default None <br /> <br />2.5 Prime Consultant Responsibility and Self-Performance <br />ECF understands that the prime consultant must perform at least 30 percent of the contract work with its <br />own organization. ECF intends to self-perform the core Electrical Engineering scope, including project <br />management, field investigation, load analysis, electrical system design, calculations, drawings, <br />specifications, cost estimating, permitting support, bidding assistance, and construction administration. <br />