My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERIC DEMPSEY ARCHITECT, LLC Bid Document (20)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
ERIC DEMPSEY ARCHITECT, LLC
>
ERIC DEMPSEY ARCHITECT, LLC Bid Document (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:10:58 PM
Creation date
8/31/2026 1:09:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A P P R O A C H & M E T H O D O L O G Y <br />Budget Control & Cost Estimation <br />The samples below illustrate the format and level of detail our estimates carry from early conceptual budgeting through construction-document pricing <br />— giving the owner a consistent, comparable cost picture at every phase. <br />Conceptual Estimate — Schematic Design. Parametric, area- and system-based. <br />Establishes the budget envelope and identifies the three or four line items that will drive <br />total cost. <br />Detailed Bill of Quantities — Design Development. Quantities taken directly from the <br />Revit model and priced by the independent third-party estimator, giving the owner <br />arm’s-length numbers. <br />Value Engineering Comparison. Alternates presented side by side with cost delta, <br />schedule impact, and a plain statement of what is given up — so the owner decides, not <br />the design team. <br />Budget Tracking — DD Through CD. A single running comparison against the original <br />target. Variance beyond 10% triggers a cost alignment review before design advances. <br />Responds to RFQ # 26-07-01, Section 5, Item 4 — Approach / Methodology (cost control and estimating). Estimating formats shown are the firm’s standard deliverables; <br />project-specific estimates are issued at the close of each design phase. <br />DEMPSEY DESIGN BUDGET CO NT RO L & COST ES TIMATION · RFQ # 26 -07 -01 PAGE 7 8 OF 113←→↑APPROACH
The URL can be used to link to this page
Your browser does not support the video tag.