Laserfiche WebLink
2. Qualifications <br />13RFQ #26-07-01 Edgewater Group <br />Sanford Marina <br />Project 04 Location: Sanford, FLName of Client: City of Sanford FloridaComplete Project Construction Cost: $17M (Ongoing)Name and Contact Information of Owner’s Project Manager: Craig RadzakAmount of Funding: FEMA Grant Application $17MEDA Grant Application $3M <br />Ongoing project. Operation On Schedule. No <br />change orders <br />Derelict Boats Illegal Sanitary Discharge <br />Derecktor Dania <br />Shipyard Site <br />Investigation <br />Project 07 Owner: Derecktor ShipyardsProject Address: 775 Taylor Lane, Dania Beach, FL 33004Contact Phone: (754) 270-8845Project Status: Ongoing <br />Derecktor Dania Shipyard is one of South Florida’s <br />premier full service superyacht shipyards, providing refit, <br />repair, maintenance, and new construction services for <br />some of the world’s largest yachts. Strategically located <br />in Dania Beach with direct access to Port Everglades <br />and the Atlantic Ocean, the facility features extensive <br />waterfront infrastructure, heavy lift capabilities, and <br />specialized marine repair services that support both <br />domestic and international vessels. <br /> <br />Edgewater provided engineering assessment and <br />planning services to support improvements to the <br />shipyard’s waterfront infrastructure. Services included a <br />comprehensive site investigation, preparation of existing <br />condition drawings and a detailed photographic <br />log, development of preliminary engineering <br />recommendations and an evaluation report, and dock <br />and pile investigations. Edgewater also performed <br />value engineering analyses to identify practical, cost <br />effective alternatives that would enhance the long term <br />performance, resiliency, and functionality of the facility. <br />About the Project