Laserfiche WebLink
2. Qualifications <br />14RFQ #26-07-01 Edgewater Group <br />Additional Projects <br />Project Name Project Location Service Provided Year Completed <br />Powerhouse Marina North Miami, FL Cost Analysis/Estimating 2024 <br />Oasis at Nurmi Isles Fort Lauderdale, FL Seawall Maintenance, <br />Alernatives, and Cost <br />Estimates <br />Ongoing <br />Fisher Island - Shoreline <br />Management <br />Miami Beach, FL Coasal Engineering, <br />Surveying, Structural <br />Inspections, Permitting, <br />Shoreline Rehab Design <br />2020 <br />Mizner Grande Boca Raton, FL Seawall Inspection Ongoing <br />Brickell Bay Miami, FL Flood Mitigation <br />Conceptual Design <br />2022 <br />Legion Park Miami, FL Preliminary Design, <br />Site Coordination, & <br />Surveying <br />2023 <br />Mayfair Arms <br />Condominium <br />Fort Lauderdale, FL Seawall Evaluation 2024 <br />Dinner Key Marina Miami, FL Floating Boat Launch <br />Design <br />2018 <br />Mediterranean <br />Apartments <br />Bay Harbor Islands, FL Seawall Observation <br />Report <br />Ongoing <br />Palo Alto Association North Miami Beach, FL Seawall Observation <br />Report <br />Ongoing