My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Edgewater Group Bid Document (39)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Edgewater Group
>
Edgewater Group Bid Document (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:12:24 PM
Creation date
8/31/2026 1:11:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to standard ERP and federal permitting pathways, Edgewater Group routinely <br />supports disaster response permitting and FEMA funded recovery projects following <br />storm events. We have secured emergency authorizations for storm damaged marina <br />infrastructure, including permits for Marker 1 Marina and Fish Tale Marina in approximately <br />60 days. Where appropriate, we also utilize streamlined USACE pathways, including <br />Nationwide Permit 3 for repair and maintenance activities, to expedite approvals for <br />eligible projects. Edgewater has significant experience coordinating the engineering, <br />permitting, and documentation required for FEMA Public Assistance reimbursement, <br />including hurricane recovery efforts for the Cities of Titusville and Sanford. <br /> <br />For navigation dredging and sediment management projects, Edgewater is currently <br />supporting the City of Sanford with the removal of sediment deposited by Hurricane Ian. <br />To accelerate approvals and improve constructability, our team is evaluating historical <br />maintenance dredging authorizations and sediment disposal strategies, including offshore <br />disposal where appropriate. This approach helps municipalities restore navigation and <br />public access while maintaining regulatory compliance, controlling costs, and positioning <br />eligible improvements for potential FEMA reimbursement. <br />Emergency Permitting, Dredging & FEMA Coordination <br />4. Approach / Methodology <br />38RFQ #26-07-01 Edgewater Group <br />Palm Harbour Marina <br />Hurricane Damages
The URL can be used to link to this page
Your browser does not support the video tag.