My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Forefront Architecture and Engineering Bid Document (2)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Forefront Architecture and Engineering
>
Forefront Architecture and Engineering Bid Document (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:13:08 PM
Creation date
8/31/2026 1:12:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ 26-07-01 Continuing Professional Architectural and Engineering Consulting Services <br />Forefront Architecture and Engineering <br />City of Sunny Isles Beach <br />25 <br />Forefront AE Workload <br />We are proud to showcase a selection of our <br />ongoing and completed projects, highlighting our <br />commitment to excellence in design, engineering, <br />and project management. Forefront is well- <br />equipped to manage the this contract while <br />upholding our current commitments. Our structured <br />approach, experienced team, and proven track <br />record ensure we deliver high-quality results on <br />time and within budget. <br />−Extensive Experience: Forefront currently <br />holds over 15 ongoing municipal continuing <br />contracts, where we have effectively managed <br />task orders and successfully completed projects. <br />Feedback from our clients consistently highlights <br />our responsiveness and professionalism, <br />demonstrating our ability to exceed expectations <br />across multiple engagements. <br />−Project Management Team: Minel Gonzalez, <br />will serve as the Project Manager for this <br />contract, supported by oversight from our Vice <br />President of Architecture, Lennard Davis, RA. <br />−Resource Allocation and Quality Control: <br />Roberto Bonet, Production Manager, oversees <br />the workload of our CAD Technicians, Drafters, <br />and Revit Modelers, ensuring efficient resource <br />allocation for the technical team assigned. As the <br />first step in our Quality Control (QC) process, he <br />upholds Forefront’s rigorous quality standards on <br />every task order. <br />−Robust Technical Support: Our skilled pool of <br />designers and drafters provides the capacity to <br />manage multiple projects concurrently, allowing <br />us to meet the District’s needs promptly without <br />compromising quality. <br />−Commitment to Communication: We prioritize <br />transparent and proactive communication <br />to ensure alignment with the project goals, <br />expectations, and deadlines. We work as 1 <br />committed team. <br />Our ability to navigate complex project <br />requirements, coordinate with multiple <br />stakeholders, and adhere to stringent public sector <br />guidelines demonstrates our capacity to adapt and <br />excel in new environments. <br />Based on our recent workload assessments across <br />the firm, Forefront has an overall capacity <br />availability of 65%. This ample capacity ensures <br />that we have the necessary resources to dedicate to <br />the City of Sunny Isles Beach project requirements. <br />Current Overall Firm Workload Availability <br />65% <br />Lennard Davis, RA 60% <br />Minel Gonzalez 80% <br />CAD/Revit Pool 60% <br />Mike Vitale, BCA 40% <br />Bill Spencer 40% <br />Chris Smith, PE 60% <br />Roberto Bonet 60% <br />Mara Marchena 80% <br />Nunzie Burzo 80% <br />TThe following provides an estimate of <br />orefront Architecture and Engineering team <br />resources available to support the City <br />of Sunny Isles Beach under a continuing <br />services contract. All key personnel are <br />full-time (40 hours per week) and ready <br />to begin work immediately <br /> upon authorization. <br />Key Personnel Availability <br />−Clermont Office Location <br />−Fort Myers Office Location
The URL can be used to link to this page
Your browser does not support the video tag.