Laserfiche WebLink
Kevin Ang, PE <br />Senior Waterfront Engineer, Project Manager <br />Kevin Ang is a Senior Waterfront Engineer/Project Manager at GEI. He is a structural engineer <br />with over 12 years of professional experience spanning multiple disciplines within the <br />engineering industry. Kevin’s experience includes waterfront and marine design, bridge <br />design, building design and the management of interdisciplinary project teams. Kevin <br />has comprehensive knowledge of engineering principles, design standards, and building <br />codes. He has also demonstrated an exceptional ability to deliver projects with condensed <br />schedules and challenging criteria. <br />PROJECT EXPERIENCE <br />Final Assembly 2, Austal, Mobile, AL. As the Waterfront Structural Lead, provide marine <br />engineering, value engineering, assistant project management, and bid support services for <br />the construction of a new final assembly ship facility. Kevin is leading all the design efforts <br />for the waterfront structures; ship lift piers, transfer bridge, bulkhead, relieving platform <br />as well as the upland structural elements; apron, cradle, and building slabs/foundations. <br />Additionally, Kevin coordinates tasks, schedules, and inter-disciplinary items within GEI’s <br />design team as well as externally with subconsultants and the client. Kevin is currently <br />leading a team of seven people in the design providing guidance, coordinating design tasks, <br />and reviewing all calculations and bid documents. <br />Davie Shipyard Modernization, Lévis, QC, Canada. As the Waterfront Structural Lead, <br />provide marine engineering, value engineering, assistant project management, and bid <br />support services for the modernization of an existing ship building facility. The scope <br />for this project includes the construction of a new vessel launch pad and several new <br />ship assembly buildings. Additionally, significant upland improvements to support the <br />operations and workflow of the facility are being done. Kevin is leading all the design efforts <br />for the waterfront structures; launch pad and bulkhead. Additionally, Kevin is leading the <br />design efforts for the new building slabs and foundations. Lastly, Kevin coordinates tasks, <br />schedules, and inter-disciplinary items within GEI’s design team as well as externally with <br />subconsultants and the client. Kevin is currently leading a team of three people in the <br />design providing guidance, coordinating design tasks, and reviewing all calculations and bid <br />documents. <br />Lawrence High School Seawall Design, Lawrence Union Free School District, <br />Cedarhurst, NY. As the Project Engineer and Lead Designer, provided marine engineering, <br />bid support, and construction administration services for the construction of a new seawall <br />around the perimeter of the high school property to protect the school from future storms. <br />Finalized the design of the seawall which is comprised of steel sheet pile and a concrete <br />seawall integral with the steel sheet pile. In addition to preventing flood overflow over the <br />concrete seawall, the steel sheet pile extends well below finished grade to prevent seepage <br />underneath the concrete seawall. The seawall was designed for a 500-yr water level and wave <br />heights along with the projected sea-level rise in the coming 100 years. Coordinated concrete <br />pump house design with the new drainage system for the high school. Answered questions <br />during the bid phase and will provide construction administration when construction begins. <br />This includes regular site visits to ensure installation of steel sheet pile and concrete follows <br />the bid documents, review submittals, and providing solutions to unforeseen conditions. <br />East Beach Bluff Stabilization, Village of Port Jefferson, Port Jefferson, NY. As the Project <br />Engineer and Lead Designer, provided marine engineering, bid support, and construction <br />administration services for the construction of two bulkhead walls to stabilize a 100 ft tall <br />bluff at the Waterview Clubhouse. The bluff stabilization is occurring in two phases. Phase <br />1 involves the construction of a bulkhead wall at the toe of the bluff, re-grading the bluff <br />to restore the bluff slope, and installation of slope stabilizing plantings and plant terraces. <br />Phase 2 will involve the construction of a new bulkhead wall at the crest of the bluff to protect <br />the existing clubhouse building from undermining and further erosion of the bluff. Provided <br />EDUCATION <br />B.S., Civil Engineering, <br />Stevens Institute of <br />Technology, May 2009 <br />INDUSTRY/GEI EXPERIENCE <br />12 years/1 year <br />REGISTRATIONS & LICENSES <br />Professional Engineer, NJ No. <br />24GE05253700 <br />TRAINING & <br />CERTIFICATIONS <br />OSHA 30 <br />TWIC <br />PROFESSIONAL <br />AFFILIATIONS <br />American Society of Civil <br />Engineers <br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 80