Laserfiche WebLink
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 81 <br />Kevin Ang, PE <br />construction support and administration services for phase I <br />including submittal review, site visits to ensure construction <br />follows bid documents, and providing solutions to in-field <br />conditions. Finalized the design and bid documents for phase <br />II and will provide the same services as phase I during the bid <br />and construction phase. <br />New Training Ship (NSMV) Pier Upgrades, State University <br />Construction Fund (SUCF SUNY), Throggs Neck, NY. As <br />the Project Engineer and Lead Designer, provided marine <br />engineering services associated with the upgrade and <br />rehabilitation of the existing Olivet Pier at SUNY Maritime in <br />order to support the berthing, mooring, and upgraded utility <br />services for the new NSMV training ship. Involved with initial <br />site investigations, permitting applications/documents, design <br />development from concept to construction documents, <br />and provided bid and construction phase services. Small <br />portions of the existing pier are to be removed and replaced <br />with new mooring and berthing dolphins. These dolphins are <br />designed to be structurally separate from the existing pier. The <br />dolphins are comprised of large diameter steel pipe piles and <br />concrete caps with mooring bollards as well as super cone <br />fenders with panels. Additionally, the rest of the existing pier <br />is to be rehabilitated including concrete pile encasements <br />for deteriorated piles, top deck and underdeck repairs. <br />Lastly, utility services for the new NSMV training ship had to <br />be coordinated with the ship builder, SUCF SUNY, the MEP <br />engineer, and all the upgrades/repairs. All of the stated work <br />was submitted and approved by the required environmental <br />agencies; New York State Department of Environmental <br />Conservation (NYSDEC) and United States Army Corps of <br />Engineers (USACE). As the Project Engineer, prepared all <br />required cut/fill calculations, project narrative, applications, <br />and documents. This work was completed on an expediated <br />schedule to meet the proposed launching date of the new <br />ship. <br />East River Esplanade Reconstruction, NYC Parks (NYCDPR), <br />Manhattan, NY. Project Engineer and Lead Designer for the <br />reconstruction of existing low-level platforms, bulkheads, and <br />waterfront infrastructure supporting the East River Esplanade <br />along the East River in Manhattan, NY. The new platform is a <br />high-level platform comprised of prestressed precast concrete <br />planks founded on rock socketed steel pipe piles. Due to the <br />platform construction changing from a low-level to high-level <br />structure, a new concrete bulkhead is required to maintain <br />adjacent grade and support of the FDR roadway. The proximity <br />of the FDR required extensive coordination with design, <br />construction feasibility, lane closures and the NYCDOT. Lastly, <br />the top side aesthetic and grading required coordination <br />between the NYCDPR, Landscape Architect, Civil Engineer, <br />and the PDC. All the stated work was submitted and approved <br />by the required environmental agencies; New York State <br />Department of Environmental Conservation (NYSDEC) and <br />United States Army Corps of Engineers (USACE). As the Project <br />Engineer, prepared all required cut/fill calculations, project <br />narrative, applications, and documents. <br />Homeport II, NYC Economic Development Corporation <br />(NYCEDC), Manhattan, NY. Project Engineer and Lead <br />Designer for the construction of a new homeport facility for <br />the NYC ferry fleet. The homeport would provide a facility <br />for the ferries to port and moor overnight, refuel, hook up to <br />upland water and electricity, and maintenance. The homeport <br />comprised of approximately 25 slips; about 21 slips were <br />comprised of large monopiles with donut fenders and mooring <br />rings and the remaining 4 slips comprised of floating docks. <br />Additionally, two piers were designed to support a large <br />travel lift that would lift the ferries out of the water for more <br />extensive maintenance and cleaning. Involved in the design of <br />the entire facility; utility platform and elevated maintenance <br />walkway, monopiles at all slips, and the travel lift pier <br />substructure/superstructure. Coordinated all utility, civil, and <br />architectural requirements between multiple consultants with <br />the marine structural scope. All the stated work was submitted <br />and approved by the required environmental agencies; <br />New York State Department of Environmental Conservation <br />(NYSDEC) and United States Army Corps of Engineers (USACE).